13.07.2015 Views

Tariff Petition 2008-09 to 2010-11 - WBSEDCL

Tariff Petition 2008-09 to 2010-11 - WBSEDCL

Tariff Petition 2008-09 to 2010-11 - WBSEDCL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TARIFF PETITION- <strong>2008</strong>-<strong>09</strong>,20<strong>09</strong>-10 & <strong>2010</strong>-<strong>11</strong>Annual generation at PPSP at a level of 800 MU during the year <strong>2008</strong>-<strong>09</strong>, 20<strong>09</strong>-10and <strong>2010</strong>-<strong>11</strong> has been estimated according <strong>to</strong> the system requirement during peak hoursconsidering optimum utilization of the surplus energy mainly during off peak hours.3.1.3 Gas Turbine Stations :The gas turbine power station at Kasba ( 2X 20 MW) , Haldia (2 X 20MW) andSiliguri ( 1X 20 MW) built up in late seventies during the period of severe power crisiswere operated primarily during the peak hours and also beyond peak hours under severepower shortage conditions at that time. Consequent upon improvement in power positionin mid-eighties, the gas turbine stations were only operated during emergency. Sincethese power stations were not utilised on regular basis no major investment was made <strong>to</strong>keep these power station in running condition. Hence due <strong>to</strong> normal wear and tear of theequipment these power stations are now lying in defunct condition.As such, no generation from these power stations as well as no cost for those Stationshas been considered for the ensuing years.3.1.4 Diesel Stations :At present the Board is maintaining diesel generation plant only at Rudranagar inSagar Island. In view of excessive cost associated with diesel generation, generationfrom diesel generating plants had <strong>to</strong> be restricted and the same has been supplementedby other source of power i.e. from non-conventional energy sources. The load inRudranagar in Sagar Island is now being catered partly through Diesel generation andpartly from Non-conventional energy sources (Solar Power). The level of dieselgeneration at lone Power Station at Rudranagar is low. In absence of adequate capacityaddition from non-conventional sources and <strong>to</strong> meet the increased load demand duringprevious years a new desesel set of capacity of 320 KVA has been commissioned in2007-08. Energy <strong>to</strong> be available from this diesel based generating stations has beenestimated at 1.04 MU, 1.14 MU and 1.26 MU in FY<strong>09</strong>, FY10 and FY<strong>11</strong> respectively.3.1.5 Green Power :Like previous years, Hon’ble Commission in the <strong>Tariff</strong> Order for 2007-08 kindlydirected <strong>WBSEDCL</strong> <strong>to</strong> explore the possibilities of purchase of power from renewable andWest Bengal State Electricity Distribution Company Ltd. 27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!