13.07.2015 Views

Tariff Petition 2008-09 to 2010-11 - WBSEDCL

Tariff Petition 2008-09 to 2010-11 - WBSEDCL

Tariff Petition 2008-09 to 2010-11 - WBSEDCL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TARIFF PETITION- <strong>2008</strong>-<strong>09</strong>,20<strong>09</strong>-10 & <strong>2010</strong>-<strong>11</strong>As per the policy of the Govt. of India, <strong>WBSEDCL</strong> is entitled <strong>to</strong> have its share fromKurichhu Hydel Power Station in Bhutan as successor entity of WBSEB. The installedcapacity of this Hydel Power Station is 60 MW. The share of <strong>WBSEDCL</strong> from this PowerStation is 50%. WBSEB started drawing power from this Power Station with effect fromNovember 2001.<strong>WBSEDCL</strong> is importing power from those power stations (Chukha HEP andKurichhu HEP) through Power Trading Corporation India Ltd ( PTC Ltd.) during theensuing years as per allocated share.Total quantum energy that would be drawn annually by <strong>WBSEDCL</strong> from Chukha &Kurichhu HEP during the years <strong>2008</strong>-<strong>09</strong>, 20<strong>09</strong>-10 and <strong>2010</strong>-<strong>11</strong> has been estimated at721 MU.B. Purchase of power from TALA HEPAs per order of MOP, GOI, 38.25% of share from Tala HEP having installedcapacity of 6 x 170 MW has been allocated <strong>to</strong> <strong>WBSEDCL</strong> (West Bengal) in lieu ofequivalent thermal power from NPTC’s Stations in ER region. The power is beingpurchased through PTC as per bilateral arrangement between GOI & Royal Govt. ofBhutan. Energy <strong>to</strong> be available from TALA HEP during the years <strong>2008</strong>-<strong>09</strong>, 20<strong>09</strong>-10 and<strong>2010</strong>-<strong>11</strong> have been estimated at 1330 MU every year.3.2.9 Purchase of Power from the NHPC :The erstwhile WBSEB was purchasing power from the Rangeet Hydel PowerStation of National Hydro-Electric Power Corp. Ltd. installed in the State of Sikkim. Asper the policy of the Govt. of India, <strong>WBSEDCL</strong> is entitled <strong>to</strong> have share of the generationas allocated <strong>to</strong> erstwhile WBSEB. The installed capacity of Rangeet Hydel Power Stationis 60 MW and the allocated share <strong>to</strong> WBSEB from this power station was 40.73% up <strong>to</strong>September, 2004. The share has been reduced <strong>to</strong> 28.43% w.e.f Oc<strong>to</strong>ber, 2004 and thesame is being continued.West Bengal State Electricity Distribution Company Ltd. 37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!