13.07.2015 Views

Tariff Petition 2008-09 to 2010-11 - WBSEDCL

Tariff Petition 2008-09 to 2010-11 - WBSEDCL

Tariff Petition 2008-09 to 2010-11 - WBSEDCL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TARIFF PETITION- <strong>2008</strong>-<strong>09</strong>,20<strong>09</strong>-10 & <strong>2010</strong>-<strong>11</strong>FY10 and FY<strong>11</strong>.However, if any such energy is not available from those units in theensuing years the adverse impact of that may be considered in the APR for therespective years.c) Bandel Thermal Power Station :Bandel Thermal Power Station (BTPS) has 4x60 MW (derated) and 1X210 MWGenerating Sets with a <strong>to</strong>tal capacity of 450 MW. As per the norms stipulated by theHon’ble Commission net energy <strong>to</strong> be available from the Bandel Thermal Power Stationduring the ensuing years FY<strong>09</strong>, FY10 and FY<strong>11</strong> has been estimated at <strong>2008</strong> MU, 2153MU, 2263 MU respectively.d) Santaldih Thermal Power StationThe Santaldih Thermal Power Station (STPS) is having existing four units of 120MW each with a <strong>to</strong>tal capacity of 480 MW. As per the norms stipulated by the Hon’bleCommission net energy <strong>to</strong> be available from the existing four units of Santaldihi ThermalPower Station during the ensuing years FY<strong>09</strong>, FY10 and FY<strong>11</strong> has been estimated at1343 MU, 1420 MU, 1499 MU respectively.One new 250 MW unit has been commissioned at STPS at the end of 2007-08. To bemore realistic and in keeping in view all fac<strong>to</strong>rs, computing <strong>to</strong>tal available generation fromSTPS additional energy <strong>to</strong> be available from the new unit during the ensuing years FY<strong>09</strong>,FY10 and FY<strong>11</strong> has been estimated at 650 MU, 950 MU, 950 MU respectively.Thus the quantum of energy <strong>to</strong> be purchased from STPS has been estimated at1993 MU, 2370 MU and 2449 MU during FY<strong>09</strong>, FY10 and FY<strong>11</strong> respectively. Duringdiscussion with WBPDCL, it appeared that projected energy is realistic.e) Sagardighi Thermal Power Station ( SgTPS)One unit of capacity 300 MW at Sagardighi Thermal Power Station has beencommissioned in February, <strong>2008</strong> and the second unit of 300 MW is at construction stageand expected <strong>to</strong> be commissioned this year. It is reported that the unit which wascommissioned in February this year had developed fault in the turbine blade and requirereplacement. As information gathered from WBPDCL recently that both the units will beWest Bengal State Electricity Distribution Company Ltd. 33

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!