Tariff Petition 2008-09 to 2010-11 - WBSEDCL
Tariff Petition 2008-09 to 2010-11 - WBSEDCL
Tariff Petition 2008-09 to 2010-11 - WBSEDCL
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
TARIFF PETITION- <strong>2008</strong>-<strong>09</strong>,20<strong>09</strong>-10 & <strong>2010</strong>-<strong>11</strong>available from Sept this year. But the energy may be available at a PLF of 50% atpresent due non completion of coal linkage. Considering the same energy <strong>to</strong> be availableduring FY 10 and FY<strong>11</strong> from both the units has been estimated at a PLF of 65% and 80respectively. Accordingly, <strong>to</strong>tal energy <strong>to</strong> be available from the new units of 300 MWcapacity each at SgTPS has been estimated at 1395 MU, 31<strong>09</strong> MU and 3826 MUduring FY <strong>09</strong>, FY 10 and FY<strong>11</strong> respectively.3.2.5. Purchase of Power from the Durgapur Projects Ltd. :The Durgapur Projects Limited (DPL) is supplying power <strong>to</strong> <strong>WBSEDCL</strong> at 33 KVand <strong>11</strong> KV on radial mode <strong>to</strong> meet the local demand of <strong>WBSEDCL</strong>’s consumers at thatarea. <strong>WBSEDCL</strong> and DPL have entered in<strong>to</strong> a PPA and as per the PPA, DPL had drawnpower from <strong>WBSEDCL</strong> at 220 /132 KV during the last two years due <strong>to</strong> prolonged outageof Unit - VI. With the re-commissioning of the unit –VI and putting in<strong>to</strong> commercialoperation of the new Unit – VII of capacity 300MW DPL is now in a position <strong>to</strong> supplypower <strong>to</strong> <strong>WBSEDCL</strong> at 220/132 KV on interconnected mode after meeting their owndemand. DPL will also supply its surplus power <strong>to</strong> <strong>WBSEDCL</strong> at 132/220 KV oninterconnected mode.Considering the trend of drawal from DPL at 33 KV and <strong>11</strong> KV during last twoyears and keeping in view that transfer of a portion of this radial load <strong>to</strong> <strong>WBSEDCL</strong>system in 20<strong>09</strong>-10 and <strong>2010</strong>-<strong>11</strong> with the development of WBEDCL system in that areathe quantum of energy <strong>to</strong> be purchased from Durgapur Projects Limited at 33 KV and <strong>11</strong>KV on radial mode during the year <strong>2008</strong>-<strong>09</strong>, 20<strong>09</strong>-<strong>2010</strong> and <strong>2010</strong>-<strong>11</strong> has been estimatedas below:Voltage <strong>2008</strong>-<strong>09</strong> 20<strong>09</strong>-10 <strong>2010</strong>-<strong>11</strong>At 33 KV 141 MU 70 MU 20 MUAt <strong>11</strong> KV 8 MU 8 MU 4 MUKeeping in view of the load growth in DPL system and present trend of availabilityfrom DPL after putting in operation of unit -VI and commercial operation of new 300 MWWest Bengal State Electricity Distribution Company Ltd. 34