13.07.2015 Views

Tariff Petition 2008-09 to 2010-11 - WBSEDCL

Tariff Petition 2008-09 to 2010-11 - WBSEDCL

Tariff Petition 2008-09 to 2010-11 - WBSEDCL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TARIFF PETITION- <strong>2008</strong>-<strong>09</strong>,20<strong>09</strong>-10 & <strong>2010</strong>-<strong>11</strong>available from Sept this year. But the energy may be available at a PLF of 50% atpresent due non completion of coal linkage. Considering the same energy <strong>to</strong> be availableduring FY 10 and FY<strong>11</strong> from both the units has been estimated at a PLF of 65% and 80respectively. Accordingly, <strong>to</strong>tal energy <strong>to</strong> be available from the new units of 300 MWcapacity each at SgTPS has been estimated at 1395 MU, 31<strong>09</strong> MU and 3826 MUduring FY <strong>09</strong>, FY 10 and FY<strong>11</strong> respectively.3.2.5. Purchase of Power from the Durgapur Projects Ltd. :The Durgapur Projects Limited (DPL) is supplying power <strong>to</strong> <strong>WBSEDCL</strong> at 33 KVand <strong>11</strong> KV on radial mode <strong>to</strong> meet the local demand of <strong>WBSEDCL</strong>’s consumers at thatarea. <strong>WBSEDCL</strong> and DPL have entered in<strong>to</strong> a PPA and as per the PPA, DPL had drawnpower from <strong>WBSEDCL</strong> at 220 /132 KV during the last two years due <strong>to</strong> prolonged outageof Unit - VI. With the re-commissioning of the unit –VI and putting in<strong>to</strong> commercialoperation of the new Unit – VII of capacity 300MW DPL is now in a position <strong>to</strong> supplypower <strong>to</strong> <strong>WBSEDCL</strong> at 220/132 KV on interconnected mode after meeting their owndemand. DPL will also supply its surplus power <strong>to</strong> <strong>WBSEDCL</strong> at 132/220 KV oninterconnected mode.Considering the trend of drawal from DPL at 33 KV and <strong>11</strong> KV during last twoyears and keeping in view that transfer of a portion of this radial load <strong>to</strong> <strong>WBSEDCL</strong>system in 20<strong>09</strong>-10 and <strong>2010</strong>-<strong>11</strong> with the development of WBEDCL system in that areathe quantum of energy <strong>to</strong> be purchased from Durgapur Projects Limited at 33 KV and <strong>11</strong>KV on radial mode during the year <strong>2008</strong>-<strong>09</strong>, 20<strong>09</strong>-<strong>2010</strong> and <strong>2010</strong>-<strong>11</strong> has been estimatedas below:Voltage <strong>2008</strong>-<strong>09</strong> 20<strong>09</strong>-10 <strong>2010</strong>-<strong>11</strong>At 33 KV 141 MU 70 MU 20 MUAt <strong>11</strong> KV 8 MU 8 MU 4 MUKeeping in view of the load growth in DPL system and present trend of availabilityfrom DPL after putting in operation of unit -VI and commercial operation of new 300 MWWest Bengal State Electricity Distribution Company Ltd. 34

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!