13.07.2015 Views

Tariff Petition 2008-09 to 2010-11 - WBSEDCL

Tariff Petition 2008-09 to 2010-11 - WBSEDCL

Tariff Petition 2008-09 to 2010-11 - WBSEDCL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TARIFF PETITION- <strong>2008</strong>-<strong>09</strong>,20<strong>09</strong>-10 & <strong>2010</strong>-<strong>11</strong>3.2.<strong>11</strong> Purchase of power from WBREDA :It has been observed through collection of wind data of different zones of WestBengal that only Sagar Island and Frazerganj areas of South 24 Parganas district hasadequate wind speed for running of wind genera<strong>to</strong>r. WBREDA installed one Wind FarmProject (1MW at Ist stage and another 1 MW at 2 nd stage) at Frazerganj. A dedicated <strong>11</strong>KV grid line has been constructed from Namkhana <strong>to</strong> Frazerganj for evacuation of powerfrom Wind farm Project. It has been estimated that 0.41 MU of energy will be purchasedevery year from WBREDA during the ensuing years <strong>2008</strong>-<strong>09</strong>,20<strong>09</strong>-10 and <strong>2010</strong>-1.3.2.12 Transmission Charges Payable <strong>to</strong> Different Agencies :Transmission charge are payable <strong>to</strong> POWERGRID against purchase of powerfrom the Central Sec<strong>to</strong>r Generating Stations against the drawal of power from NTPC,PTC (Chukha Power and KURICHHU), TALA HEP, NHPC (Rangeet Power) attransmission tariff of POWERGRID in Eastern Region.<strong>WBSEDCL</strong> would also have <strong>to</strong> pay a proportionate cost <strong>to</strong> SLDC <strong>to</strong> the tune of Rs. 13 Cr.every year which includes ERLDC charge, ULDC charge and SLDC Charge for usingboth Central and State grid.3.2.13 UI Charges and Grid Loss :In ABT regime <strong>WBSEDCL</strong> would have <strong>to</strong> furnish every day its scheduled drawalfrom central sec<strong>to</strong>r generating stations for the next day in 96 time blocks (block of 15minutes). This scheduled drawal is at the bus-bar of the generating station. To get theenergy available at the <strong>WBSEDCL</strong>’s system we have <strong>to</strong> consider the loss in state grid.Besides <strong>WBSEDCL</strong> may have pay or realize UI charges due <strong>to</strong> mismatch in scheduleand actual drawal during any 15 minutes time block. But for estimate purpose no UI isconsidered for the years <strong>2008</strong>-<strong>09</strong>,20<strong>09</strong>-10 and <strong>2010</strong>-<strong>11</strong> as all surplus energy has beenWest Bengal State Electricity Distribution Company Ltd. 40

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!