13.07.2015 Views

Tariff Petition 2008-09 to 2010-11 - WBSEDCL

Tariff Petition 2008-09 to 2010-11 - WBSEDCL

Tariff Petition 2008-09 to 2010-11 - WBSEDCL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TARIFF PETITION- <strong>2008</strong>-<strong>09</strong>,20<strong>09</strong>-10 & <strong>2010</strong>-<strong>11</strong>Station Energy <strong>to</strong> be supplied <strong>to</strong> Govt. of Sikkim has been estimated at 46 MU each yearduring the years <strong>2008</strong>-<strong>09</strong>, 20<strong>09</strong>-10 and <strong>2010</strong>-<strong>11</strong>2.3 Sale <strong>to</strong> persons other than licensee in the state and otherconsumers:2.3.1. Sale of incidental surplus energy <strong>to</strong> the persons others than consumers andlicense during FY<strong>09</strong>,FY10 and FY<strong>11</strong> has been estimated at 4648 MU, 6<strong>11</strong>1 MU and5502 MU respectively taking in<strong>to</strong> account additional surplus energy <strong>to</strong> be made availablefrom the new projects/ extension of projects of WBPDCL/ DPL after meeting therequirement of consumers, the other licensees and power required in pumping mode ofPPSP.2.4. Estimate of Transmission and Distribution Losses :2.4.1. The Hon’ble Commission has fixed year wise allowable transmission loss forWBSETCL for the years from <strong>2008</strong>-<strong>09</strong> <strong>to</strong> 2015-16. In terms of the said norms yearwiseallowable Transmission losses of WBSETCL for FY <strong>09</strong>, FY10 and FY<strong>11</strong> are given below:Year <strong>2008</strong>-<strong>09</strong> 20<strong>09</strong>-10 <strong>2010</strong>-<strong>11</strong>Transmission loss (%) 3.90 3.80 3.70While assessing the energy balance of <strong>WBSEDCL</strong> we consider those percentage oftransmission loss for the energy <strong>to</strong> be transmitted through the system of WBSETCL <strong>to</strong><strong>WBSEDCL</strong> system.2.4.2. The main issue in sub-transmission and distribution system is the reduction ofDistribution (T&D) losses <strong>to</strong> acceptable minimum levels. The Hon’ble Commission hasfixed year wise allowable distribution loss for <strong>WBSEDCL</strong> for the years from <strong>2008</strong>-<strong>09</strong> <strong>to</strong>2015-16. In terms of the said norms yearwise allowable distribution losses of <strong>WBSEDCL</strong>for FY <strong>09</strong>, FY10 and FY<strong>11</strong> are given below :West Bengal State Electricity Distribution Company Ltd. 21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!