13.07.2015 Views

Tariff Petition 2008-09 to 2010-11 - WBSEDCL

Tariff Petition 2008-09 to 2010-11 - WBSEDCL

Tariff Petition 2008-09 to 2010-11 - WBSEDCL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TARIFF PETITION- <strong>2008</strong>-<strong>09</strong>,20<strong>09</strong>-10 & <strong>2010</strong>-<strong>11</strong>achieved. On the basis of revised allocation of share as shown above and considering80% PLF, the energy <strong>to</strong> be purchased from Farakka STPS during the year <strong>2008</strong>-<strong>09</strong>,20<strong>09</strong>-10 and <strong>2010</strong>-<strong>11</strong> has been estimated at a level of 1936 MU every year.Kahalgaon Thermal Power Station (KhSTPS) Stage I :In terms of order of MoP, Govt. of India re-allocating share of Eastern Regionalstates in consideration of allocation of power from TALA HEP, <strong>WBSEDCL</strong>’s allocationform NTPC’s Kahelgaon Stage-I Thermal Power Station has been withdrawn.However, a share of 83 MW of power has been allocated <strong>to</strong> <strong>WBSEDCL</strong> from KhSTPSStage II as stated earlier. Energy <strong>to</strong> be available against that allocated share of 83 MWpower has been estimated at 206 MU, 618 Mu and 618 MU respectively during the years<strong>2008</strong>-<strong>09</strong> 20<strong>09</strong>-10 and <strong>2010</strong>-<strong>11</strong> and <strong>to</strong> be paid at the same rate of FSTPS.Talcher Thermal Power Station (TSTPS) :NTPC’s power station at Talcher has 2x500 MW i.e. <strong>to</strong>tal capacity of 1000 MW. Forthe purpose of availing incentive NTPC will have <strong>to</strong> maintain availability above 80%. Onthe basis of actual availability and considering allocated share of power from TalcherThermal Power Station, <strong>WBSEDCL</strong>’s drawal from that power station has been estimatedat 624 MU every year during the ensuing years <strong>2008</strong>-<strong>09</strong>, 20<strong>09</strong>-10 and <strong>2010</strong>-<strong>11</strong>.CERC introduced multi year ABT <strong>Tariff</strong> for the block 2004-20<strong>09</strong> in respect of CentralSec<strong>to</strong>r Power Stations, erstwhile WBSEB was required <strong>to</strong> pay Fixed Charges of NTPCPower Stations as per share allocation. As such, in the event the drawl of Central Sec<strong>to</strong>rPower less than allocation during off peak hours, per unit cost of purchase of power willbe higher for the payment of <strong>to</strong>tal Fixed Charge as per allocated share and therebyincrease the revenue requirement which would ultimately lead <strong>to</strong> increase in averagecost for sale of power. Thus, the admissible share of NTPC’s Power Station has <strong>to</strong> beavailed fully. After meeting the requirement of the consumers and the other licensees ofthe state and also the requirement of pumping energy at PPSP during off peak period theincidental surplus energy will be sold <strong>to</strong> others through competitive bidding.West Bengal State Electricity Distribution Company Ltd. 39

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!