13.07.2015 Views

announcements, tablings and committee reports - Parliament of ...

announcements, tablings and committee reports - Parliament of ...

announcements, tablings and committee reports - Parliament of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4842 [Tuesday, 29 October 2013Armscor Corporate Plan 2012/13 – 2014/15Armscor aligns its strategic priorities with the Government’s Medium-TermStrategic Framework (MTSF) <strong>and</strong> the DOD Outcomes derived from theMTSF. It states that it plays a supporting role in terms <strong>of</strong> contributing toOutcome 3: “All people in South Africa are <strong>and</strong> feel safe”.Performance Overview: Selected Achievements <strong>and</strong> ChallengesThe Service Level Agreement between Armscor <strong>and</strong> the DOD specifiestargets to be reached (brackets indicate the achievement for the FY2012/13):• Acquisition activities [Goals 1 – 3]: Contracts to be placed byArmscor (Achieved goals except for System Support: Acquisition<strong>and</strong> Procurement).• Management <strong>of</strong> Defence Industrial Participation (DIP) [Goal 4](Objective not achieved).• Management <strong>and</strong> execution <strong>of</strong> defence technology, research, test<strong>and</strong> evaluation requirements by the DOD [Goal 5] (Objectiveachieved)• Management <strong>and</strong> performance against Dockyard m<strong>and</strong>ate(Objective achieved).Armscor’s Three-year Corporate Plan includes two groups <strong>of</strong> performanceindicators. The first relate to performance against Armscor’s functions asdefined by the Service Level Agreement with the Department <strong>and</strong> thesecond measures performance against the set strategic objectives <strong>of</strong> thegroup. A total <strong>of</strong> 32 Key performance Indicators (KPI) were identified for2012/13 <strong>and</strong> adherence to these KPI’s are as follows:• 23 <strong>of</strong> the 32 KPI’s have been achieved.• 9 <strong>of</strong> the KPI’s (28 per cent) have not been achieved.Of the 9 KPI’s not achieved, which mainly related to issues <strong>of</strong> leadership,only one (KPI 3.1) was in close proximity to the goal set to be achieved.Armscor lists the following as highlights <strong>of</strong> the 2012/13 financial year:• Clean audit• Achieved level 3 BBBEE rating from level 7• Dockyard obtained ISO 9001: 2008 accreditation• Achieved a surplus <strong>of</strong> R84.6m (2012/13) against R70.2m in 2011/12• CSI Flagship programme – “Learner Enhancement Programme” insupport <strong>of</strong> Maths <strong>and</strong> Science in schools resulted to an average <strong>of</strong>51% improvement in these subjects.• LUH - All 30 Helicopters have been delivered to SAAF <strong>and</strong> updatedwith latest production st<strong>and</strong>ards.• Rooivalk – Rooivalk fleet was upgraded to the MK1 deploymentbaseline.• New Local Warning Segments <strong>of</strong> the Ground Based Air DefenceSystem has been completed.• 90 young engineers <strong>and</strong> scientists were identified for successionplanning.ANNOUNCEMENTS, TABLINGS AND COMMITTEE REPORTS NO 147─2013

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!