13.07.2015 Views

Washington Works - DuPont

Washington Works - DuPont

Washington Works - DuPont

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Contract Administration Initiated: 07/1992 CAG-07Site Conditions SC1 Revised: 05/2013 Monitor: John SorokaRetention: 3 yrs after obsolete or superseded Revision Due: 10/2015 Page 233.5 Fire ExtinguishersContractor shall furnish a sufficient number of the proper type of fire extinguishers to protect itswork area and extinguish any fire that may result in the performance of its work.3.6 Oily Rag StorageDirty and oily used rags shall be kept in fireproof metal containers with self closing lids. Contactthe Contractor Environmental Coordinator at 304-863-4463 for instructions on disposal.3.7 Protective StructuresAny plastic, tarpaulin, or other material used to construct a hut, tent, or similar protective structureshall be flame retardant.3.8 Burning and Welding EquipmentThe use of acetylene will not be permitted on this site due to its highly explosive characteristics.In lieu of acetylene, the use of MAPP, propylene, propane or natural gas is acceptable. Allcylinders must be capped when not in use and secured at all times.All oxy-fuel burning and welding units shall be equipped with combination flashback arrestorsand check valves between the torch AND on the hoses at the regulator.All users of oxy-fuel burning and welding equipment shall be trained in safe operating techniques.One portable fire extinguisher having a rating of not less than 2-A:20-B:C shall be kept at eachlocation where welding or cutting is to be performed.4 CONSTRUCTION FACILITIES4.1 Identification (if applicable)Contractor shall post a sign of a size and character consistent with the size, nature and duration ofthe contract, identifying its site headquarters, which may be an office, trailer, toolbox, or storagearea.4.2 ParkingContractor’s employees shall park in the designated construction parking area only. First timeviolators will be towed at the contractor employee’s expense; Second time violators will be towedat the contractor’s expense.4.3 Site AccessNormal site working hours are 6:30 a.m. to 5:00 p.m., Monday through Friday. Entry and exit atall times shall be through the designated gate.Contractor employees shall be confined to a specific work area. Designated routes will beestablished for access to the work area and for movement of material and equipment. Movementof material and equipment shall be scheduled with <strong>DuPont</strong>.4.4 Contractor VehiclesAll contractor vehicles must have some type of identification indicating the company that theybelong to. This identification must be visible on both sides and can be magnetic or painted. ThisCopyright © 2012 E. I. du Pont de Nemours and Company. All rights reserved

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!