13.07.2015 Views

Washington Works - DuPont

Washington Works - DuPont

Washington Works - DuPont

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Contract Administration Initiated: 07/1992 CAG-07Site Conditions SC1 Revised: 05/2013 Monitor: John SorokaRetention: 3 yrs after obsolete or superseded Revision Due: 10/2015 Page 91.8 Safety TrainingContractor’s on-site supervisor shall ensure that all required safety training is completed beforepersonnel start work and continues throughout all phases of the work. Contractor shall informeach employee of his/her responsibility to work safely and prevent occupational injury.1.9 <strong>DuPont</strong> Representative<strong>DuPont</strong> shall designate "<strong>DuPont</strong> Representatives" through whom all work questions orinterpretations must be cleared.1.10 Pre-Construction MeetingThis meeting will be held between the Contractor representatives and the <strong>DuPont</strong>representatives as soon as possible after award of Contract to ensure all parties are aware of jobsafety plans and requirements. Contractor shall be represented by the on-site job superintendentand Quality Assurance Representative who attended meetings held before award (pre-bid, preaward,etc.).<strong>DuPont</strong> reserves the right to waive this meeting if such meeting is not warranted.1.11 Safety MeetingsContractor shall hold a 10-15 minute safety meeting for its personnel at the beginning of theshift each Monday. Meeting attendance shall be documented and furnished to <strong>DuPont</strong>.Contractor’s on-site supervisor shall attend a weekly safety meeting held every Thursday in theBuilding 13 Orientation Room. This meeting is conducted by random safety professionals todiscuss general safety issues and concerns and the gang box safety topic for the following week.Allow one hour per week for this meeting.1.12 Safety AuditsContractor's job supervisor shall conduct multiple weekly audits of their personnel andcommunicate results to the CA. Also, they will participate with <strong>DuPont</strong>'s SafetyRepresentative/CA/FCA in a weekly field safety audit of all Contractors’ work areas.1.13 Site SecurityProper identification shall be provided before site entry is permitted. Vehicular traffic shall bekept to a minimum and all contractors, visitors and vehicles are subject to search.Only the driver of the vehicle can enter the guard gate, all contractors must use turnstiles uponentering and leaving the site1.14 Contractor Sign-Up and BadgingContractor personnel will be required to participate in <strong>DuPont</strong>'s sign-up and badging procedureat the site. Contractor employees will be issued electronic "CONTRACTOR" badgesBadges will remain in the possession of the employee if one of one of the following conditionsare meet.a. Contractor employee is on site (~32 hours) per weekb. Core group of Contractor as designated and approved by Contract Administrator.c. Special case as approved by Contractor Administrator.All Contractor Badges will remain at Building 13 Contract Administration. Badges are to beCopyright © 2012 E. I. du Pont de Nemours and Company. All rights reserved

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!