13.07.2015 Views

Washington Works - DuPont

Washington Works - DuPont

Washington Works - DuPont

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Contract Administration Initiated: 07/1992 CAG-07Site Conditions SC1 Revised: 05/2013 Monitor: John SorokaRetention: 3 yrs after obsolete or superseded Revision Due: 10/2015 Page 24identification must be used for the duration of the visit on this Plant. If there is no identificationavailable at the time of entrance, the vehicle will not be allowed to enter.Except for material delivery, only one Contractor owned vehicle (used only by supervisorypersonnel) will be permitted on the plant site. Additional vehicles may be admitted with priorapproval of the <strong>DuPont</strong> Contractor Administrator.All personnel inside the vehicle cab must wear seat belts while on any <strong>DuPont</strong> property. Seat beltsmust be worn when operating any mobile equipment on <strong>DuPont</strong> property. Plant posted speedlimits shall be observed.4.5 Contractor Trailer and Construction ShantiesContractor facilities such as office trailers, material trailers, and construction shanties requireapproval for placement and set-up on site prior to their arrival. These facilities shall meet thestandard N.E.C. Article 550 National Electric Code requirements for electric power. Facilities setwithout prior approval will be removed and relocated at the Contractor’s expense. Coordinatelocation and approval through the Contract Administrator. Refer to <strong>Washington</strong> <strong>Works</strong> Safety& Health Procedure 579, Temporary Building Site Procedure. (Supplied as required during prejobmeeting)All contractor facilities (trailers, shanties and associated laydown areas) shall be kept orderly andrepaired as needed. Should Contractor fail to comply with mentioned facility standards, <strong>DuPont</strong>will perform this work on a time-and-material basis and back-charge the Contractor4.6 Telephone – Cellular PhonesIt is the Contractor’s responsibility to arrange for telephone service on Plant through the localtelephone company. Prior to making these arrangements, Contractor must contact the sitetelephone coordinator at 304-863-4299.Cellular phones are allowed on site for use OUTSIDE of the operating areas. Cellular phones thathave picture or video capabilities will not be allowed within the operating units. Cellularphones are not allowed to be used while “operating” a vehicle or equipment.4.7 Drinking Water and Sanitary FacilitiesContractor shall provide drinking water and sanitary facilities (if necessary due to remote workaway from <strong>DuPont</strong> provide facilities) in compliance with OSHA requirements. Drinking watercontainers must be sealed and capable of being tightly closed and equipped with a tap. Watercontainers must be clearly marked as to the nature of their contents.Cups must be disposable. Both a sanitary container for the unused cups and a receptacle fordisposing of the used cups must be provided. The cardboard cup container provided by cupmanufacturer is not considered sanitary.4.8 Water<strong>DuPont</strong> will furnish water for construction and testing purposes. Contractor shall make allconnections and run any hoses and pipe extensions required.Fire hydrants shall not be used as a source of water without <strong>DuPont</strong>'s prior written approval.Copyright © 2012 E. I. du Pont de Nemours and Company. All rights reserved

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!