13.07.2015 Views

Washington Works - DuPont

Washington Works - DuPont

Washington Works - DuPont

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Contract Administration Initiated: 07/1992 CAG-07Site Conditions SC1 Revised: 05/2013 Monitor: John SorokaRetention: 3 yrs after obsolete or superseded Revision Due: 10/2015 Page 5Section Task Description Req’d TaskComplete1.38 Construction Equipment being rented or operated - “Eng Standard – EN-1088””1.39 Crane Use - Crane operator qualification reports to be completed andsubmitted to <strong>DuPont</strong> prior crane work.1.39 Critical Lift -- Rigging preplan to be submitted to <strong>DuPont</strong> for review -acceptance 30 days prior lift.1.41 Performing work from Platform suspended from Crane. Contractor to submitdetails of its proposed aerial work platform and rigging methods.2.4-2.5 If work requires specific work tasks (such as, welding, crane operation,HPWC, NDT, etc ) - certificates of training must be provided.3.4 Flammable Material Safety Cabinets being brought on Site -- Must beapproved3.5 Fire Extinguisher Required3.6 Fire Proof Metal Container for disposal of dirty and oily rags4.5 Bringing Contractor Trailer/Shanties and/or material trailers -“Procedure 561”4.6 PDAs, Electronic devices and Cell phones w/Cameras must be approved XX6.10 Tools – Equipment being brought onto site – Site Property Pass is requiredprior bringing items on site - --“Form S-74”6.11 Construction Material/Parts being shipped directly to <strong>DuPont</strong> Site6.12 Roads needing closing6.13 Personnel must speak, write, read and comprehending the English language orTranslation Plan must be issued/approved by <strong>DuPont</strong>6.15 Work Permits will be required prior work performed - “ Procedure 586” XX6.15 Working on equipment to be locked out -- “ Procedure 508”6.15 Hot Work (Flame ) being performed -- “ Procedure 532”6.15 Hazardous Line Breaks being performed -- “ Procedure 574”6.15 Close Proximity Work - Work being performed within 15’ of overhead powerline, process or service pipe -- “Procedure 575”6.15 Work being performed in vessel, tank, manholes or confined space -“Procedure 530” – Contractor Shall Submit a Cerfication of Training6.15 Excavation work being performed -- “Procedure 541”6.15 X-ray or Laser equipment will be used -- “Procedure 503”8.0 Pre-Fabricating Pipe being brought on site -- MERI required at B104Page 4 and 5 Completed and Returned to <strong>DuPont</strong> by - Signature :DateCopyright © 2012 E. I. du Pont de Nemours and Company. All rights reserved

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!