13.07.2015 Views

Washington Works - DuPont

Washington Works - DuPont

Washington Works - DuPont

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Contract Administration Initiated: 07/1992 CAG-07Site Conditions SC1 Revised: 05/2013 Monitor: John SorokaRetention: 3 yrs after obsolete or superseded Revision Due: 10/2015 Page 306.15 PermitsWork Permits and daily work plans will be required per <strong>Washington</strong> <strong>Works</strong> S&H Procedure586, Contractor Work Permits/Job Plans. (Supplied as required during pre-job meeting)Contractor shall coordinate the completion of necessary permits forms with designated <strong>DuPont</strong>representative prior work being executed.Before assigning a worker to any job, new or repetitive, Contractor's supervision shall develop“Job Plan“, safety task assignment (JSA or STA) which and explaining to the worker the safetyprecautions and actions that must be taken before proceeding with the task. The JSA/STA’s are tobe written and on a form approved by <strong>DuPont</strong>. Contractor Companies are required to use the siteform. The JSA shall be initiated by the contractor supervisor or lead personnel with input from allcrew members. Contractor supervision and lead personnel shall complete a training class on howto properly fill out the site form. The form shall be kept at the job location for auditing purposeWhere additional planning and coordination is required, Contractor will be informed to fill out thenecessary permit forms covering the next day’s work and submit them the afternoon for approvalby the designated <strong>DuPont</strong> Representative. A detailed work plan for the next day’s activities mustbe attached to the work permit when deemed necessary by the Contractor or the designated<strong>DuPont</strong> representative.LT&Try Permit, if required, Contractor shall comply with the requirements of <strong>Washington</strong><strong>Works</strong> S&H Procedure 508, the site's Lock, Danger Tag, Try and Test procedureFlame Permits, if required to perform the work will be required on a daily basis. Contractor shallfill out the necessary permit forms to cover the next day’s work and submit them daily forapproval by the designated <strong>DuPont</strong> representative. <strong>Washington</strong> <strong>Works</strong> S&H Procedure 532.Hazardous Line Breaks will be performed per the requirements of <strong>Washington</strong> <strong>Works</strong> S&HProcedure 574.Close Proximity Permits will be required daily for use of construction equipment over, or within15 feet of, any overhead electric power line, process pipe, or service pipe. Contractor shall fill outthe necessary permit forms and submit them 72 hours in advance for <strong>DuPont</strong>'s approval, per<strong>Washington</strong> <strong>Works</strong> S&H Procedure 575.For work around electric lines and cables, refer to <strong>DuPont</strong> Engineering Standard E5Z Grounding(3.4a), or raising or rerouting (3.4b) electric lines, if required, will be performed by others.Vessel or Confined Space Entry Permits will be required daily for any work inside a vessel orconfined space (i.e., any area which must be entered through a restricted opening, such as tanks,vessels, ductwork, vessel skirts, manholes, etc). per <strong>Washington</strong> <strong>Works</strong> S&H Procedure 530.Contractor shall fill out the necessary permit forms and submit them sufficiently in advance toallow all required approvals to be obtained before work in the vessel or confined space isscheduled to start. <strong>DuPont</strong> will perform the atmospheric tests.Excavation Permit will be required for each area to be excavated, per <strong>Washington</strong> <strong>Works</strong> S&HProcedure 541. <strong>DuPont</strong> will provide the Contractor with a copy of the permit 5 working daysbefore Contractor commences excavation work in the area covered by the permit. Contractor shallcomply with all restrictions stated in the permit. Contractor shall provide a competent person inCopyright © 2012 E. I. du Pont de Nemours and Company. All rights reserved

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!