13.07.2015 Views

Decontamination in primary care dental practices - Gov.uk

Decontamination in primary care dental practices - Gov.uk

Decontamination in primary care dental practices - Gov.uk

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

12 Installation, validation, ma<strong>in</strong>tenance and test<strong>in</strong>g of sterilizers12 Installation, validation, ma<strong>in</strong>tenance andtest<strong>in</strong>g of sterilizersMa<strong>in</strong>tenance and servic<strong>in</strong>g12.1 The sterilizer should be ma<strong>in</strong>ta<strong>in</strong>ed and serviced <strong>in</strong>accordance with the manufacturer’s <strong>in</strong>structions.Validation and test<strong>in</strong>g12.2 Validation is needed for new equipment at<strong>in</strong>stallation and annually thereafter. It will also benecessary to validate equipment after any majorrepairs have been carried out. Manufacturers’guidance on validation should be followed.12.3 The follow<strong>in</strong>g type-tests or works tests will berequired.EuropeanNorm(EN)referenceB S N Manufacturer EN 13060Test Type Performed byDynamic chamberpressureAir leakage B S Manufacturer EN 13060Empty chamber B S N Manufacturer EN 13060Solid loadNon-wrappedS<strong>in</strong>gle-wrappedDouble-wrappedN SSB SManufacturer EN 13060Small porous itemsS<strong>in</strong>gle-wrappedDouble-wrappedSmall porous loadS<strong>in</strong>gle-wrappedDouble-wrappedFull porous loadS<strong>in</strong>gle-wrappedDouble-wrappedSSSB SSB SManufacturer EN 13060Manufacturer EN 13060Manufacturer EN 13060Hollow load B S Manufacturer EN 13060Solid load drynessNon-wrappedS<strong>in</strong>gle-wrappedDouble-wrappedSSB SManufacturer EN 13060Small porousitems: drynessS<strong>in</strong>gle-wrappedDouble-wrappedSSManufacturer EN 13060Test Type Performed bySmall porous load:drynessS<strong>in</strong>gle-wrappedDouble-wrappedFull porous load:drynessS<strong>in</strong>gle-wrappedDouble-wrappedSSSB SEuropeanNorm(EN)referenceManufacturer EN 13060Manufacturer EN 13060Residual air S N Manufacturer EN 13060Microbiological test B S N Manufacturer EN 13060(optional)Note: Immediately after <strong>in</strong>stallation, the air leakage andempty chamber tests should be undertaken by theCompetent Person (<strong>Decontam<strong>in</strong>ation</strong>) or serviceeng<strong>in</strong>eer.12.4 Tests not def<strong>in</strong>ed <strong>in</strong> the referred Standards arefurther def<strong>in</strong>ed <strong>in</strong> Chapter 15.Periodic tests12.5 The follow<strong>in</strong>g test<strong>in</strong>g protocol is recommended.Additional tests as def<strong>in</strong>ed by the manufacturershould also be performed.NoteUsers and operators (when delegated) should receivethe appropriate tra<strong>in</strong><strong>in</strong>g before carry<strong>in</strong>g out any ofthese tests. This tra<strong>in</strong><strong>in</strong>g should be documented onpersonal tra<strong>in</strong><strong>in</strong>g records.The Registered Manager should liaise with theequipment manufacturer with regard to tra<strong>in</strong><strong>in</strong>g.55

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!