21.07.2015 Views

864 ST Fireplace Installation Manual - Lopi

864 ST Fireplace Installation Manual - Lopi

864 ST Fireplace Installation Manual - Lopi

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table of Contents 3IntroductionOverview.................................................................2Listing Details..........................................................2Safety PrecautionsSafety Precautions...................................................4Features and SpecificationsFeatures.................................................................6<strong>Installation</strong> Options...................................................6Heating Specifications ..............................................6Dimensions.............................................................6<strong>Installation</strong>Packing List.............................................................7Additional Items Required..........................................7Recommended <strong>Installation</strong> Procedure .........................7Massachusetts Requirements.....................................8Top Vent or Side Vent Configuration............................9Converting the <strong>Fireplace</strong> to Side Vent Configuration...9<strong>Fireplace</strong> Placement Requirements.............................11Clearances...........................................................11Raised <strong>Fireplace</strong>s .................................................11Min. Framing Dims................................................12Nailing Brackets....................................................13Gas Line Requirements.............................................14Fuel ....................................................................14Gas Line Connection .............................................14Gas Inlet Pressure ................................................14Gas Line Location .................................................15Electrical Connection (required)..................................16Wall Switch or Thermostat <strong>Installation</strong> .........................17Wiring Diagram (Millivolt System) ............................17Wall Switch <strong>Installation</strong>...........................................17Vent Requirements...................................................18Vent Clearances ...................................................18Altitude Considerations ..........................................18Approved Vent......................................................19Vent <strong>Installation</strong>....................................................19Approved Vent Configurations....................................20Restrictor Position.................................................20Exhaust Restrictor Adjustment................................20Intake Restrictor Adjustment...................................21Diffuser Plate Adjustment.......................................22Side Vent Config. W Horizontal Term. (no vertical rise).. 23Side Vent Config. W Horizontal Term. (w vertical rise)....24Side Vent Configuration with Vertical Termination ..........25Top Vent Configuration with Horizontal Termination........26Top Vent Configuration with Vertical Termination ...........27Termination Requirements.........................................28<strong>Installation</strong> (continued)Hearth Requirements ............................................... 29Facing Requirements ............................................... 30Drywall <strong>Installation</strong> ................................................30Facing Overview ...................................................31Optional Faceplates – Sizing Chart..........................31Thin Facing <strong>Installation</strong>..........................................32Thick Facing <strong>Installation</strong>.........................................34Thick Facing <strong>Installation</strong> with FPX Arched Faces........35Mantel Requirements................................................ 37Install Example - Build-Out (Dog-House) w Hor. Term.... 37Finalizing the <strong>Installation</strong>Steps for Finalizing the <strong>Installation</strong> ............................. 38Starting the Pilot Flame .........................................38Pilot Flame Inspection...........................................38Air Shutter Adjustment...........................................39Glass Frame Removal and <strong>Installation</strong>........................ 40Log Set <strong>Installation</strong> .................................................. 42Optional EquipmentLP Conversion Instructions ....................................... 52Fireback <strong>Installation</strong> ................................................. 56Grill <strong>Installation</strong>........................................................ 58Remote Control Receiver <strong>Installation</strong> (2 Options) ......... 59Extra Room Power Heat Duct (sku 98500769)............ 60Andiron <strong>Installation</strong>................................................... 61IndexIndex...................................................................... 62© Travis Industries 4071126 100-01195_000

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!