21.07.2015 Views

M/s. API Ispat & Powertech Private Limited, Vill ... - Seiaacg.org

M/s. API Ispat & Powertech Private Limited, Vill ... - Seiaacg.org

M/s. API Ispat & Powertech Private Limited, Vill ... - Seiaacg.org

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

transportation of plants/machineries/equipmentsi construction materials etc'to the site For controlling fugitive dust during transportation and constructionworks, regular sprin'kling of ',,raterin village roads and other vulnerable areasof the plant snatt also be ensured The emissiQn from vehicles engaged fortransportation of plants/machineries/ equipments/construction materials etc.to the site shall be ensured within prescribed vehicle emission norms. Firstaid and sanitation arrangements shall be made for the drivers and othercontract workers during construction phase.(xvlii) The construction of effluent treatment system and installation of air pollutioncontrol equipments shall be taken up simultaneously with othercivil/mechanical works of forward integration unit. The progress of theactivities related to the prolect shall be submitted periodically to ChhattisgarhEnvironment Conservatron Board, Raipur, Regional Office, ChhattisgarhEnvironment Conservation Board, Raipur, SEIAA, Chhattisgarh and RegionalOffice, Ministry of Environment & Forests, Government of lndia, Bhopal(xix) Adequate safety measures shall be provided in the plant area tocheck/minimize spontaneous fires. Copy of the these measures with fulldetails along with location plant layout shall be submitted to ChhattisgarhEnvironmeni Conservation Board, Raipur, Regional Office, ChhattisgarhEnvironment Conservation Board, Raipur, SEIAA, Chhattisgarh and RegionalOffice, Ministry of Environment & Forests, Government of lndia, Bhopal(xx) Disaster Management plan shail be prepared to meet any eventuality in caseof an accideni taking place. Mock drills shall be conducted regularly andbased on the same, modifications required, if any shall be incorporated in theDMP(xxi) As far as possible maximum area of open spaces shall be utilized forplantation purposes. Project authority shall abide by the decisions taken byMinistry of Environment and Forests, Go'rernment of lndia / CentralGovernmenU Central Pollution Control Board from time to time in this regard.Tree density of 1500-2000 trees per hectare (600 nos. of plants per acre)with local nroaO leaf species should be maintained. A wide green belt ofbroad leaf local species shall be developed in at least 33% of the projectarea. Central Pollution Control Board guidelines shall be followed in planningand developing green belt and selection of species etc'(xxii) project authority shall provide garland drains with appropriate check dams allalong the raw materials storage areas etc. to avoid any possibility of erosionlweaiing away) during rain. Garland drain (size, gradient & length) and sumpcapacity shali be designed keeping 50% safety margin over and above thepeat< sudden rainfall and maximum discharge in the area adjoining the projectsite. Sump capacity shall also provide adequate retention period to allowproper settling of siit material. Sedimentation pits shall be constructed at thecorners of the garland drains. Project authority shall provide adequatecollection and treatment arrangement for proper management of storm water.The surface run-off shall be de-silted through a series of check dams anddrains.(xxiii) Project authority shall adopt rainwater-harvesting technique in the projectarea for recharge of ground water. Entire rain water shall be properly storedand used for various processes. The rainwater-harvesting technique shall beincorporated right from the design stage of all structures. Project authorityshall develop iainwater-harvesting structures to harvest the rainwater forVI

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!