21.07.2015 Views

M/s. Gupta Infrastructure (India) Private Limited, 7th ... - Seiaacg.org

M/s. Gupta Infrastructure (India) Private Limited, 7th ... - Seiaacg.org

M/s. Gupta Infrastructure (India) Private Limited, 7th ... - Seiaacg.org

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

v) The road drainage shall be designed to enable qr.rick runoff of surface waterand prevent water logging. rne ro"ao tev"r sn;['il kept at least 0.5 to 1.0 meterabove the observed nish rcod rever_ iG;;ili;"r';sp-s' shailu;;;;;;;"su,be foilowed on rRC:t-nq prlllii""rpirir ,o.os, wer _ritsurfaced footpaths andshall smoothbe provid'ed. rrre nbSro*g.r rhrir 'nu'rtri.,,y'prohibitedalongtheroads,l,li . .,. il*,'lI'"",, ,,',ivi) Total area for parking !r-o,,viieo snal oe at least for 789 Nos. cars. AdequateOthers: -provision sha, be rnade ,o .rJ"l, tne pa*ing"lq"s parking sha, be furyinternalized,??dno, public space should nu uttir"o. parking spaces standardsas given in 'Manual on Norms and standaros ror Environmental clearance ofLarge construction projects' bt r M;;ril Government of lndia f,ryud, of Environr.nf shalt & be adapted. '-" rForests,i) Rtt mandatory.ap.provals and permissions as required from Airport Authority,Director of explosives and Fire bepartment etc. .nltt U" obtained.ii) unskilled construction labourers shall be recruited from the iocal areas.construction materiars shail be procured rocaily as far as possibre.iii) Provisions shail be made for the rntegration ;i:;;;water heating system.iv) Provision of vermi-composting for tfie oloougiuorble solid wastes generatedfrom the complex as well t't tnu rrrgu #*n1 of biomass that shall beavailable from the tree plantation shall bj made.v) The ground water shall not be abstract"l-*itnort prior permission from thecompetent authority in the comprex area. permission to draw g;uno watershall be obtained from the competent authority piior to construction / operationof the project.vi) Adequate roadside drains shall be..provided along the road to facilitate its bettermaintenance and increase in the life of the carriigu*"y, which shall avoid soilerosion and land degradation due to watei stffition. The roadside drainsshall be provided on both sides of tne roal iotiiitrci"at and cross drainagesystem shall be regularly maintained. Adequate nJw drainage woi-ks and crossdrainage structures shall be provided,,for t'r"ttn p"ssage of runoff. Filling ofexisting natural drainage courses,shall be rtr"irv Juoioeo. suitable drainage atconstruction site and camp shall be provideJ'to eliminate the formation ofstagnant water pools.vii)iRegular supervisio.n gf the above and other measures for monitoring should bein ptace ail fhrough {jie constr-uction pnasesurroundings.;;;t;" avoid disturbance . j..:-i, i''to theviii) Under "provisroffi theF,lyinlrslt,{,frotection) Act, 1986, tegarbe initiatedactionas,theshalconst,:uctjcbrrnp'6fb;".i;;; il;" starredEnvironmenialwithout obtainingcleaian,ce,a. ,",'".' ,, Ill. Ope-ration PhaseSewa ge Treatment ptant:3l]ll?:9il1* -::flfF! certify the insralration of the sewase rreatmentfj?:jltg) :*::f:t il'li:r.us a rb;n{r ou,uo,itt"d ;;;AAt#:ffi;;,;:"j:j:, ^,T ^pj:.r.".1 i'_ g g l m i s gl o nl?i":*l: : :."^Y?:: ::f:ii':'- :onv"i,?, a ;;i;, ;;;# and sewage treatmentil ffffsyptem requrar:,'t-- -)rrHrrrY rvrrEr''.{,P ensure the treated effluent quality 'il;within rho cionr{-..ro ^.^'l;^-:,.^.--"J ;n'.q u ;i ; ;r r; ;; ; ;ffi ' ;ffi ""'Jo,try o[. Environment and Forests,I t.t i9'{:7LE6*ls*

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!