21.07.2015 Views

Untitled

Untitled

Untitled

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CONTENTInformation about the Company’s Subsidiary and Affiliated OrganizationsHydropower plants and renewable energy sourcesJSC “Bukhtarminskaya HPP”JSC “Bukhtarminskaya HPP” was established in accordancewith the decision #1053 dated December 19, 1996 “OnEstablishment of Joint Stock Company “BukhtarminskayaHPP” Released from the Reorganized Joint Stock Company“Altayenergo” of East Kazakhstan Territorial Committee onManagement of the State Property.According to the Resolution of the Government of theRepublic of Kazakhstan #1020 dated October 24, 2006 “Onthe Transfer of State Shares of Some Joint Stock Companiesto the Authorized Capital of JSC “Kazakhstan Holding forManagementof State Assets “Samruk”, on December 28,2006 the state-owned shares of JSC “BukhtarminskayaHPP” were transferred to the authorized capital of JSC“Holding “Samruk”. On January 4, 2008 JSC “Samruk-Energy” became the owner of the state-owned shares ofJSC “Bukhtarminskaya HPP”.“Bukhtarminskaya HPP” is located 15 km downstream fromthe mouth of the river Buhtarmy, 350 km from the head ofthe Irtysh River. Back pressure created by the BHPP damoverrides the natural levels of Zaysan Lake for 5-6 meters,forming a reservoir with 49.6 billion cubic meters capacity.Surface area is 5490 square kilometers.The largest shareholder of JSC “Bukhtarminskaya HPP” isJSC “Samruk-Energy” – 90% of shares.Electricity production in 2012 was 2,315.5 million kW/h.ABOUT THE COMPANYIntegrated Report 2012 27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!