21.07.2015 Views

Untitled

Untitled

Untitled

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CONTENTInformation about the Company’s Subsidiary and Affiliated OrganizationsHydropower plants and renewable energy sourcesJSC “Shulbinskaya HPP”JSC “Shulbinskaya HPP” is located in the middle reachof the Irtysh River, 70 km above the city of Semey.Construction of hydropower plant started in 1976 and thefirst hydroelectric set was launched into operation onDecember 23, 1987, while the last of six hydroelectric setswas put into operation on December 19, 1994.The capacity of hydro system objects is designed toaccept 240 m maximum flood under normal waterlevel with 1% probability of exceedance – 7770 m 3 /sec,andunder maximum water level of 243 m of 0.01%probability – 8770 m 3 /sec.The structure of Shulbinskaya HPP includes:• power house;• earth dam;• navigation lock;• water reservoir;• grade-control structure;• 220 kV outdoor switchgear.The major shareholder of JSC “Shulbinskaya HPP” is JSC“Samruk-Energy” – 92.14% of shares.Electricity production in 2012 was 1347.9 million kW/h.ABOUT THE COMPANYIntegrated Report 2012 29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!