21.07.2015 Views

OPERATION MANUAL - Scintrex

OPERATION MANUAL - Scintrex

OPERATION MANUAL - Scintrex

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Setting Up Your InstrumentSurvey setup screenThe Survey Setup screen is one of the key screens of the system. It providesaccess to three sub-options; the Survey options, the Station Designationoptions and the Parameter options in order to configure your SM-5NAVMAG.The survey Setup screen enables you to create the survey header required inthe data file. This includes the:• Survey identifier• Name of the client• Name of the operator• Grid reference point• Station designation system2-4SM-5 Manual - part # 872700 Revision 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!