22.08.2015 Views

Liebert PPC Precision Power Center

Liebert® PPC™ Precision Power Center - DCES

Liebert® PPC™ Precision Power Center - DCES

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

IMPORTANT SAFETY INSTRUCTIONSSAVE THESE INSTRUCTIONSNOTERead the entire manual before installing or operating the system.! WARNINGThe shipping bands may be under tension. Use appropriate eye, face and hand protection tosafeguard against injury from band backlash.! WARNINGVerify that all incoming line voltage (power) and low voltage (control) circuits arede-energized and locked out before installing cables or making connections, whether in thejunction box or in the unit.Equipment inspection and startup should be performed only by trained personnel. Lethalvoltages are present during startup procedures. Electrical safety precautions must befollowed throughout inspection and startup.Only qualified service personnel should perform maintenance on the <strong>Liebert</strong> <strong>PPC</strong>. All voltagesources to the unit must be disconnected before inspecting or cleaning within the cabinet.Lethal voltages exist within the equipment during operation. Observe all warnings andcautions in this manual. Failure to comply may result in serious injury or death. Obtainqualified service for this equipment as instructed.The monitoring system contains a lithium battery for memory backup. Danger of explosion ifbattery is incorrectly replaced. Replace only with same or equivalent type. Dispose of usedbatteries according to manufacturer’s instructions.NOTEThe unit should not be loosened from the shipping pallet until after all handling by forklift orpallet jack is completed.All power and control wiring should be installed by licensed electricians and must comply withthe NEC and applicable codes.1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!