22.08.2015 Views

Liebert PPC Precision Power Center

Liebert® PPC™ Precision Power Center - DCES

Liebert® PPC™ Precision Power Center - DCES

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Installation Instructions1.0 INSTALLATION INSTRUCTIONS1.1 Unpacking and InstallationNOTERead the entire manual before installing and operating the system. Upon receipt of a<strong>Liebert</strong> <strong>PPC</strong>, the installer should perform the following steps to ensure a quality installation.1.1.1 Unpacking and Preliminary InspectionA quality installation begins on the receiving dock.1. Inspect the shipping crate(s) for damage or signs of mishandling before unpacking the unit(s).Check Shock-Watch indicator.2. Open the shipping crates carefully. (Use care to avoid puncturing the container with sharp objectsthat would damage the contents.)3. Remove the packing and vapor barriers and inspect the equipment for any obvious shippingdamages.NOTEThe units should not be loosened from the shipping pallet until after all handling by forklift orpallet jack is completed. Complete internal inspection should be accomplished only afterequipment positioning and prior to electrical hookup.If any damage as a result of shipping is observed, immediately file a damage claim with the shippingagency and forward a copy to:Emerson Network <strong>Power</strong>1050 Dearborn DriveP.O. Box 29186Columbus, Ohio 43229 USA1.1.2 Handling ConsiderationsThe <strong>Liebert</strong> <strong>PPC</strong> is bolted to a wooden pallet to allow handling by forklift equipment.• Easily moved - The <strong>Liebert</strong> <strong>PPC</strong> is furnished with casters to allow the unit to be rolled into placeafter it has been unbolted from the pallet.• Check size and weight - Refer to Table 1 and the cabinet drawings furnished with the unit forsize and weight information.• Plan the route - Decide the best route for the unit to follow to the installation area to ensurethat all passages are large enough to accommodate the unit and the floors are adequate to supportthe weight. Is there adequate room in doorways, elevators, ramps, etc.? Are there any non-negotiablecorners or offsets in the hallways?• Move with care - To prevent panel damage, Emerson recommends removing the exterior panelsbefore the unit is moved. When replacing panels, remember to reconnect all panel ground wires.Table 1kVA300-800kVA <strong>Liebert</strong> <strong>PPC</strong> dimensionsTransformer Section Distribution Side Section(s) 1Dimensions - in. (mm)Dimensions - in. (mm)WeightW D H lb. (kg) W D HWeightlb. (kg)300 43 (1092) 2 32 (813) 77 (1956) 2450 (1111) 43 (1092) 2 32 (813) 77 (1956) 650 (295)450 43 (1092) 2 32 (813) 77 (1956) 3176 (1441) 43 (1092) 2 32 (813) 77 (1956) 650 (295)800 87 (2210) 32 (813) 77 (1956) 6720 (3048) 43 (1092) 2 32 (813) 77 (1956) 650 (295)NOTES1. 800kVA requires two (2) distribution side sections2. Includes a 1" side panel2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!