Project Facts and His<strong>to</strong>ry<br />

• Mani<strong>to</strong>ba Hydro is the electric power and natural gas utility in<br />

the province of Mani<strong>to</strong>ba, Canada<br />

• Founded in 1961, as a provincial Crown Corporation<br />

• Operates 15 interconnected hydro generating stations<br />

• 527,000 electric power /263,000 natural gas cus<strong>to</strong>mers<br />

• Acquired Pointe du Bois in 2002; it is the oldest generating<br />

station; began operations in 1911<br />

• <strong>In</strong>itiated plans for $800 million Pointe du Bois modernization in<br />

2007<br />

• Approved <strong>to</strong> replace the 78MW powerhouse, dam and spillway<br />

with a 120-MW powerhouse<br />

• Construction projected <strong>to</strong> take six years with a planned inservice<br />

date of 2015<br />

• This plan was withdrawn in 2011<br />

<strong>In</strong> <strong>Situ</strong> <strong>Francis</strong> turbine <strong>Blade</strong> <strong>Replacement</strong> | NWHA Hood River| 2013-05-23<br />