Elements and Considerations of the Business Case<br />

• Fac<strong>to</strong>rs discussed are not definitive of Mani<strong>to</strong>ba Hydro’s<br />

business position - represented as some of the project<br />

considerations<br />

• With the Powerhouse replacement project cancelled – a<br />

smaller project was envisaged<br />

• Business case prepared <strong>to</strong> repair/res<strong>to</strong>re limited units<br />

• Several runners are grossly cavitated and some with partial<br />

loss of blades/band damage<br />

• Several units were shut down for safety<br />

• Some units partially disassembled and or being repaired<br />

• Refurbishment is a multiple year multiple unit project including<br />

mechanical, electrical and structural elements<br />

• The business case focused on Unit 13<br />

<strong>In</strong> <strong>Situ</strong> <strong>Francis</strong> turbine <strong>Blade</strong> <strong>Replacement</strong> | NWHA Hood River| 2013-05-23<br />

7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!