25.09.2015 Views

M16 Maintenance Manual TM9-1005-319-23.pdf - CombatRifle.net

M16 Maintenance Manual TM9-1005-319-23.pdf - CombatRifle.net

M16 Maintenance Manual TM9-1005-319-23.pdf - CombatRifle.net

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ARMY TM 9-<strong>1005</strong>-<strong>319</strong>-23&P<br />

AIR FORCE TO 11 W3-5-5-42<br />

2-16. UPPER RECEIVER AND BARREL ASSEMBLY, RIFLE BARREL ASSEMBLY, AND UPPER RECEIVER<br />

ASSEMBLY (CONT).<br />

t. REASSEMBLY (CONT)<br />

7. Mechanical Zero Procedures (A.F. Only).<br />

a. Mark a piece of plastic card stock or rigid paper<br />

with lines from 1 to 5mm in 1 mm increments Set<br />

the card on the front sight frame and check the<br />

height of the top of the front sight post.<br />

b. Using a dummy round or front sight post tool<br />

adjust the front sight so the top of the front sight<br />

post is 5mm above the machined surfaces of the<br />

front sight frame.<br />

2-54 Change 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!