3.- Industrial building
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Catalogue<br />
<strong>Industrial</strong> Construction<br />
NEW FACILITIES FOR PHARMACEUTICAL CENTER NORTH<br />
Performance Surface : 4.800 m²<br />
Year of implementation : 2014<br />
Execution time :<br />
5 meses<br />
Construction of new facilities for Center pharmacist in North Cenfarte in the Candina in<br />
Santander.<br />
It has an automatic dispenser of last generation that brings speed and efficiency to processes of<br />
reception of goods and implementation of orders to pharmacies in Cantabria.<br />
The most noteworthy features are:<br />
• prefabricated piles 7.678, 70 ml.<br />
• 289.185,04 kg steel B500S.<br />
• 1,500 m³ concrete pillars and solera.<br />
• 7.560, 91 m² concrete polishing.<br />
• 2,391, 80 m² precast panel cover.<br />
• 1230 m² wall structural silicone curtain.<br />
• Fire complete installation, electricity, low voltage, air conditioning, natural gas and<br />
ventilation.<br />
Warehouse for pharmaceutical Center of North Santander (Cantabria).