03.11.2015 Views

3.- Industrial building

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Catalogue<br />

<strong>Industrial</strong> Construction<br />

NAVES NIDO, POLÍGONO EMPRESARIAL BESAYA. REOCÍN (CANTABRIA).<br />

Performance Surface : 22.260 m²<br />

Year of implementation : 2010<br />

Execution time :<br />

10 months<br />

Execution of 60 warehouses, divided into three groups of 21, 18 and 21 ships, with surfaces<br />

ranging between 190 m2 and 400 m2. The three <strong>building</strong>s are developed on one floor, no<br />

defined initial use and the following relationship of surfaces of each of apples (including patios):<br />

1. Grouping 21 ships 7.923 m².<br />

2. Grouping 18 ships 6.276 m².<br />

<strong>3.</strong> Grouping 21 ships 8.007 m².

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!