Catalogue<br />

<strong>Industrial</strong> Construction<br />

CANTABRIA TECHNOLOGY CENTER. AUXILIARY BUILDINGS AND<br />

COMMUNICATIONS TOWER.<br />

Performance Surface : <strong>3.</strong>390 m²<br />

Year of implementation : 2010<br />

Execution time :<br />

14 months<br />

Execution of the auxiliary <strong>building</strong>s "Enterprice Command Center" (ECC) to Santander Global<br />

Facilities, fully total built area of 2.945,60 m2, and "Center of interpretation technology" (ILC),<br />

total floor area of 445,25 m2, administrative use and reception of visitors, each of two floors<br />

without basement, connected by a footbridge, irregular polygonal‐shaped irregular structural<br />

reinforced concrete system indoor plant of reinforced concrete and steel profiles covered with<br />

steel cut, seen and colored concrete facade.<br />

In addition to these two <strong>building</strong>s were constructed other <strong>building</strong>s such as the energy Central<br />

(CEN), communications tower (TOR), logistic block (block) and Access Control (COA), as well as<br />

all plants of the same.<br />

Cantabria Technology Center. Auxiliary <strong>building</strong>s<br />

and communications in industrial estate Marina<br />

Tower and Medio Cudeyo (Cantabria).