3.- Industrial building
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Catalogue<br />
<strong>Industrial</strong> Construction<br />
CANTABRIA TECHNOLOGY CENTER. AUXILIARY BUILDINGS AND<br />
COMMUNICATIONS TOWER.<br />
Performance Surface : <strong>3.</strong>390 m²<br />
Year of implementation : 2010<br />
Execution time :<br />
14 months<br />
Execution of the auxiliary <strong>building</strong>s "Enterprice Command Center" (ECC) to Santander Global<br />
Facilities, fully total built area of 2.945,60 m2, and "Center of interpretation technology" (ILC),<br />
total floor area of 445,25 m2, administrative use and reception of visitors, each of two floors<br />
without basement, connected by a footbridge, irregular polygonal‐shaped irregular structural<br />
reinforced concrete system indoor plant of reinforced concrete and steel profiles covered with<br />
steel cut, seen and colored concrete facade.<br />
In addition to these two <strong>building</strong>s were constructed other <strong>building</strong>s such as the energy Central<br />
(CEN), communications tower (TOR), logistic block (block) and Access Control (COA), as well as<br />
all plants of the same.<br />
Cantabria Technology Center. Auxiliary <strong>building</strong>s<br />
and communications in industrial estate Marina<br />
Tower and Medio Cudeyo (Cantabria).