<strong>Industrial</strong> Construction<br />

PLANTA DE GENERACIÓN ELÉCTRICA CON BIOMASA<br />

Performance Surface : 18.708 m²<br />

Year of implementation 2010<br />

Execution time :<br />

12 months<br />

Construction of new plant based on the production of electricity from energy recovery by combustion<br />

of biomass of forest origin. These wastes are burned in the biomass boiler by transferring heat to the<br />

water that turns into steam to drive a turbine coupled to an alternator whose purpose is the<br />

production of electricity.<br />

The plant was built on a plot of 11<strong>3.</strong>45, 49 m² in the Besaya Business Park of Reocín. In this plot, the<br />

space dedicated to the plant is 18.708 m², of which 1,100 m² will be built‐up area and 3,800 m²<br />

surface corresponding to facilities.<br />

The various <strong>building</strong>s that make up the biomass plant are:<br />

• Turbine <strong>building</strong>,<br />

• Biomass storage silo,<br />

• Buildings boiler and electric,<br />

• Waste and water treatment <strong>building</strong>s,<br />

• Electrical substation,<br />

• Screening,<br />

• Building of reception and processing of biomass.<br />

Power plant with biomass in the Business Park Besaya (Cantabria).