06.11.2015 Views

proposals – Addendum

bf35cb34-05cf-4f96-a8fb-0adfa54cc3c9

bf35cb34-05cf-4f96-a8fb-0adfa54cc3c9

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ANNEXES<br />

GREEN CLIMATE FUND FUNDING PROPOSAL | PAGE 87 OF 101<br />

I<br />

Component 4. Science, technology, knowledge management, and monitoring and evaluation<br />

systems established<br />

The generation of knowledge and innovation is the essence of this component. The studies to be carried<br />

out will estimate the carbon sequestered and stored in aguajales and describe its hydrological cycle and<br />

ecology. In addition, innovation to improve efficiency in transportation and bio-businesses will be<br />

promoted. Efforts will be made to systematically learn from the project lessons and to establish a<br />

communications strategy. The environmental impacts of this component are positive. These direct<br />

operational activities have minor or non-significant effects.<br />

In summary, the negative potential impacts, albeit minor, should be mitigated as follows:<br />

Activities related to Risks Potential Impact<br />

Institutional<br />

strengthening<br />

Increased motor boat<br />

traffic and solid waste<br />

Increased motor boat<br />

traffic and solid waste<br />

- Mortality of aquatic<br />

life<br />

- Contamination of<br />

soil, water and air<br />

Main mitigation<br />

measures<br />

- Plan trips efficiently to<br />

reduce motor boat<br />

traffic<br />

- Solid waste disposal<br />

campaigns<br />

Promotion of biobusinesses<br />

Unsustainable<br />

harvesting of natural<br />

resources<br />

Use of fossil fuels to<br />

generate energy for<br />

processing<br />

- Depletion of<br />

natural resources<br />

- Contamination of<br />

soil, water and air<br />

- Strict monitoring of<br />

management plans<br />

- Use available town<br />

energy, when possible,<br />

and examine the<br />

possibility of using<br />

renewable energy<br />

In terms of environmental safeguards, the performance standards applied are summarized as follows,<br />

taking into consideration that PS1, PS3, PS6 and PS7 are those most directly related to the project’s core<br />

business.<br />

PS1: Assessment and management of environmental and social risks and impacts. The project will<br />

not generate significantly negative environmental impacts. Instead, institutional strengthening of<br />

government and community institutions, coupled with management plans for the sustainable use of<br />

natural resources for income-generating bio-businesses, will contribute to the proper care of the natural<br />

resource base in the province. The risk of negative impacts is minor or not significant and can be<br />

mitigated. These risks are related to increased pollution due to motor boat traffic, solid-waste production<br />

in meetings and workshops, and use of fossil fuels to generate energy for adding value to bio-business<br />

production. Mitigation measures have been designed.<br />

PS3: Resource efficiency and pollution prevention. The project will not generate any significant<br />

pollution or greenhouse gas emissions. In addition, to avoid soil contamination and emissions from the<br />

processing plants used for biodiversity product transformation, alternative energy generation based on<br />

renewable resources will be attempted. Innovation in bio-businesses will be promoted to ensure the<br />

processing efficiency of sustainably harvested products.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!