proposals – Addendum
bf35cb34-05cf-4f96-a8fb-0adfa54cc3c9
bf35cb34-05cf-4f96-a8fb-0adfa54cc3c9
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
ANNEXES<br />
GREEN CLIMATE FUND FUNDING PROPOSAL | PAGE 87 OF 101<br />
I<br />
Component 4. Science, technology, knowledge management, and monitoring and evaluation<br />
systems established<br />
The generation of knowledge and innovation is the essence of this component. The studies to be carried<br />
out will estimate the carbon sequestered and stored in aguajales and describe its hydrological cycle and<br />
ecology. In addition, innovation to improve efficiency in transportation and bio-businesses will be<br />
promoted. Efforts will be made to systematically learn from the project lessons and to establish a<br />
communications strategy. The environmental impacts of this component are positive. These direct<br />
operational activities have minor or non-significant effects.<br />
In summary, the negative potential impacts, albeit minor, should be mitigated as follows:<br />
Activities related to Risks Potential Impact<br />
Institutional<br />
strengthening<br />
Increased motor boat<br />
traffic and solid waste<br />
Increased motor boat<br />
traffic and solid waste<br />
- Mortality of aquatic<br />
life<br />
- Contamination of<br />
soil, water and air<br />
Main mitigation<br />
measures<br />
- Plan trips efficiently to<br />
reduce motor boat<br />
traffic<br />
- Solid waste disposal<br />
campaigns<br />
Promotion of biobusinesses<br />
Unsustainable<br />
harvesting of natural<br />
resources<br />
Use of fossil fuels to<br />
generate energy for<br />
processing<br />
- Depletion of<br />
natural resources<br />
- Contamination of<br />
soil, water and air<br />
- Strict monitoring of<br />
management plans<br />
- Use available town<br />
energy, when possible,<br />
and examine the<br />
possibility of using<br />
renewable energy<br />
In terms of environmental safeguards, the performance standards applied are summarized as follows,<br />
taking into consideration that PS1, PS3, PS6 and PS7 are those most directly related to the project’s core<br />
business.<br />
PS1: Assessment and management of environmental and social risks and impacts. The project will<br />
not generate significantly negative environmental impacts. Instead, institutional strengthening of<br />
government and community institutions, coupled with management plans for the sustainable use of<br />
natural resources for income-generating bio-businesses, will contribute to the proper care of the natural<br />
resource base in the province. The risk of negative impacts is minor or not significant and can be<br />
mitigated. These risks are related to increased pollution due to motor boat traffic, solid-waste production<br />
in meetings and workshops, and use of fossil fuels to generate energy for adding value to bio-business<br />
production. Mitigation measures have been designed.<br />
PS3: Resource efficiency and pollution prevention. The project will not generate any significant<br />
pollution or greenhouse gas emissions. In addition, to avoid soil contamination and emissions from the<br />
processing plants used for biodiversity product transformation, alternative energy generation based on<br />
renewable resources will be attempted. Innovation in bio-businesses will be promoted to ensure the<br />
processing efficiency of sustainably harvested products.