24<br />
State of Good Repair<br />
in Fy16, we continue our commitment to keeping our system in top form by targeting $392 million<br />
to maintain our existing bus and rail system. In addition, $51 million is directed to safety and<br />
security capital projects, which include technology enhancements such as cameras and video<br />
screens on our buses and at our rail stations. Finally, $26 million will be dedicated to capital<br />
infrastructure improvements throughout our transit system. Some of the notable projects included<br />
in this $469 million total are highlighted below. For a detailed listing of operating capital projects,<br />
refer to pages 64-69.<br />
asset iMproveMent & Maintenance<br />
Metro’s Board has established a policy requiring that our assets be maintained in accordance<br />
with manufacturer recommended standards and that the Board be notified of any instances of<br />
deferred maintenance. Accordingly, more than $392 million and 150 projects are planned in FY16<br />
to enhance our maintenance capabilities and to keep our assets in a state of good repair.<br />
Asset maintenance planned in FY16 to benefit bus and rail modes are nearly equal with budgets<br />
of $195 million and $163 million, respectively. The method for allocation of maintenance resources<br />
between modes factors in the age and use of existing assets along with anticipated new assets.<br />
The asset improvement and maintenance plan for the Metro Rail system will result in improvements<br />
to all lines with emphasis on the oldest rail lines. Refurbishment of Blue Line stations that is<br />
already in progress will continue, as will the ongoing rehabilitation of the overhead catenary system.<br />
Operating capital<br />
by category<br />
OPeRATinG cAPiTAl<br />
AsseT<br />
By MODe iMPROveMenT sAFeTy cAPiTAl<br />
($ in ThOUsAnDs) & MAinTenAnce & secURiTy inFRAsTRUcTURe TOTAl<br />
Note<br />
Totals may not add due to rounding.<br />
Blue Line $ 24,657 $ 16,394 $ 2,776 $ 43,827<br />
Gold Line 1,061 - - 1,061<br />
Green Line 1,757 1,394 - 3,151<br />
Red/Purple Line 22,597 12,418 863 35,878<br />
Multiple Rail Lines 112,991 3,471 2,777 119,239<br />
Bus 195,732 25 14,572 210,329<br />
Mixed Mode 14,558 14,578 1,808 30,944<br />
Other 18,912 2,882 3,020 24,814<br />
Total Operating capital by Mode $ 392,266 $ 51,161 $ 25,816 $ 469,244