08.12.2012 Views

bellingham infill toolkit - City of Bellingham

bellingham infill toolkit - City of Bellingham

bellingham infill toolkit - City of Bellingham

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

. small lot<br />

Site requirements and setbacks<br />

Parcel size: minimum: greater than three thousand square feet<br />

(3,000sf), maximum: five thousand square feet (5,000sf)<br />

Side setbacks: minimum five feet (5’)<br />

Rear setback: minimum ten feet (10’) with no alley OR zero on<br />

an alley, with a twenty-two foot (22’) minimum backup distance<br />

accommodated within the alley ROW<br />

Front setback: minimum ten feet (10’), maximum twenty feet<br />

(20’)<br />

All garage structures shall be setback twenty five feet (25’) or<br />

more from the front property line<br />

Bulk and Massing<br />

Floor Area Ratio (FAR): 0.35<br />

No floor plate greater than 800sf<br />

Detached garages up to 220sf are exempt from FAR<br />

Attached garages are included in FAR<br />

Open Space<br />

Shall have a minimum <strong>of</strong> 60% <strong>of</strong> the site area in pervious<br />

materials (may include pervious paving and green ro<strong>of</strong>s)*<br />

8<br />

5'<br />

50'<br />

40'<br />

5'<br />

DRAFT DRAFT<br />

Buildable Area<br />

10'<br />

FRONT<br />

Figure b.0 Typical setbacks in plan<br />

10'<br />

20’<br />

100'<br />

<strong>bellingham</strong> <strong>infill</strong> <strong>toolkit</strong> -DRAFT AUGUST 12, 2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!