INDUSTRIAL BUILDIN65,<br />

STANDARD M ETHODS OF MEÄSUREMENT<br />

METHOD B - SCENARIO 2. ONE STORY, MULTIPLE OCCUPANTS<br />

Determining Rentable Area in an lndustrial Buildinq<br />

Using the Drip Line Methodology<br />

One Story, Multiple Occupants<br />

Refer to lllustraiion 82.1 and lllustration 82.2, and follow<br />

these steps to determine the rentable area of the building:<br />

'1.<br />

Determine the drip line area of the full floor bounded by<br />

the drip line. Refer to lllustration 2 and lllustration 82,1.<br />

2. Determine the floor area of any permanent mezzanines<br />

or unclassified mezzanines bounded by the drip line<br />

at the building perimeter. Referto lllustration 3 and<br />

lllustration 82.1.<br />

3. Determine the total drip line area of ihe building by<br />

adding the full floor drip line area from step # l to<br />

the mezzanine area from step #2. This will be the<br />

drip line area of the building.<br />

4. ldentify all space located on either the full floor or a<br />

mezzanine that is finished and measure its floor area<br />

to the centerline of walls between it and adiacent<br />

unfinished areas.<br />

5. ldentify and measure any areas requiring disclosure,<br />

including<br />

. Restricled headroom area<br />

. Unclassified mezzanines<br />

. Connectors or Þortions thereof<br />

ô. These âreas represent the drip line area of the building<br />

The following steps will calculaie the rentable area<br />

of the building and each of its occupants. Refer to<br />

lllu F2.2 and classify all areas within the drip<br />

line on the floor and all mezzanines except iemporary<br />

mezzanines into one of the following five classes of<br />

space:<br />

. Major vertical penetrations<br />

. Occupant areas<br />

. Building amenitv areas<br />

. Building service areas<br />

. Floor service areas<br />

7. Determine the boundaries between each class of space<br />

using the wall priority diagram shown in the Appendix.<br />

B, Calculate the areas of each class and category of space<br />

and tabulate them using the global summary of areas<br />

as shown below including separate occupant areas<br />

for each occupant measured to the centerline of their<br />

demising walls,<br />

9. Within each class of space, separately delineate and<br />

calculate rentable areas of any space that are finished<br />

or require disclosure.<br />

A tabulation of the results of applying these five steps to the<br />

building shown in lllustration 82.1 is as follows<br />

Mezzanine<br />

Attached<br />

Ground Level<br />

Full Floor<br />

Totals<br />

FINISHED<br />

UN.FINISHED TOTAL<br />

7,672 6,182 13,854<br />

7,587 32,035 39,622<br />

15,259 38,217 53,476<br />

t 15 t<br />

rO AVOID MISINTERPRËTAIION, THIS PAGE SHOULD NOT BE USED WITHOUT THE COMPLËTE DOCUN/ËNI<br />