BOMA
BOMA_Industrial_Buildings_Standard_Methods_of_Measurements_2016
BOMA_Industrial_Buildings_Standard_Methods_of_Measurements_2016
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
INDUSTRIAL BUILDINGS.<br />
STANÐARD METHODS OF MEASUREMÊNT<br />
DRIP LINE<br />
SËCOND LEVEL<br />
DOORS<br />
OVERHEAD<br />
DOORS<br />
t<br />
VOID<br />
OPEN TO AELOW<br />
a<br />
VOfD<br />
OPEN fO AELOW<br />
UNIf A<br />
UNIT A<br />
HAL<br />
DRIP LINE<br />
GROUND LEVELMEUNINE<br />
DRIP LINE<br />
GROUND LEVEI<br />
KEY,<br />
I<br />
I<br />
MAJOR VERTICAL PENEIRATION<br />
BUILDING SERVICE ARFA<br />
FLOOR SERVICE ARÊA<br />
I<br />
r<br />
OCCUPANT AREA AREA<br />
FINISHED OCCUPANT AREA<br />
ts1 I<br />
TO AVOID MISINTERPRETATION, THIS PAGE SHOULD NOT BE USED WITHOUT THE COI,IPLETE DOCUMENI<br />
COPYRIGHT O 2012 BY BOi\4A INTERNATIONAL AND SIOR. ALL RIGHTS RESERVED.