Mauldin April 2017 Report

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Sewer <strong>Report</strong>s<br />

Permit Drawing Review | 4 Manhole Inspections | 74<br />

Inspect Contstruction Sites | 8<br />

Inspect PW Crews | 8<br />

Manhole Repairs | 21<br />

Sewer Main Creek Crossings | 23<br />

Clean Sewer Main | 2228 LF<br />

ROW Easement Maintenance | 1450 LF<br />

Video Recording | 2028 LF<br />

Sewer | Manhours Task Allocation<br />

New Camera Equipment, deliver & return | 20 MH<br />

Equipment Maintenance | 15 MH<br />

Equipment Pre-trip | 24 MH<br />

Training | 16 MH<br />

Pump Station Inspection | 5 MH<br />

Clean Storm Drains | 18 MH<br />

SSO, West Golden Strip | 22 MH<br />

Sewer | Percentages of Labor Hours<br />

Admin/Plan Reviews | 10%<br />

Equipment Pre-Trip | 6%<br />

Weekly Equipment PMIs | 5%<br />

Assign. to Street Dept. | 2%<br />

Manhole Inspections | 18%<br />

Manhole Repairs | 11%<br />

Pump Station Inspections | 4%<br />

ROW - Easement Maint | 13%<br />

Sewer Trunk Line Cleaning | 15%<br />

Training | 5%<br />

Video Recording | 11%