Sewer <strong>Report</strong>s<br />
Permit Drawing Review | 4 Manhole Inspections | 74<br />
Inspect Contstruction Sites | 8<br />
Inspect PW Crews | 8<br />
Manhole Repairs | 21<br />
Sewer Main Creek Crossings | 23<br />
Clean Sewer Main | 2228 LF<br />
ROW Easement Maintenance | 1450 LF<br />
Video Recording | 2028 LF<br />
Sewer | Manhours Task Allocation<br />
New Camera Equipment, deliver & return | 20 MH<br />
Equipment Maintenance | 15 MH<br />
Equipment Pre-trip | 24 MH<br />
Training | 16 MH<br />
Pump Station Inspection | 5 MH<br />
Clean Storm Drains | 18 MH<br />
SSO, West Golden Strip | 22 MH<br />
Sewer | Percentages of Labor Hours<br />
Admin/Plan Reviews | 10%<br />
Equipment Pre-Trip | 6%<br />
Weekly Equipment PMIs | 5%<br />
Assign. to Street Dept. | 2%<br />
Manhole Inspections | 18%<br />
Manhole Repairs | 11%<br />
Pump Station Inspections | 4%<br />
ROW - Easement Maint | 13%<br />
Sewer Trunk Line Cleaning | 15%<br />
Training | 5%<br />
Video Recording | 11%