sustainabilityreport2003.pdf
sustainabilityreport2003.pdf
sustainabilityreport2003.pdf
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
proposed new rail infrastructure such as West Island Link and South Island<br />
Link. Details on these surveys and initiatives are presented in this chapter.<br />
5.2 MAINTAINING PASSENGER NUMBERS – DELIVERING OUR BEST<br />
The MTR network is designed to meet our customers’ needs. For our rail<br />
operations, this means the provision of equitable access to affordable, safe,<br />
useful and reliable transportation, while continually reducing our consumption<br />
of non-renewable resources, the noise we generate and our emissions to air<br />
and water.<br />
The reliability and punctuality of MTR trains is unaffected by road traffic or<br />
weather conditions. Our trains run 19 hours a day, 7 days a week, from<br />
06h00 to 01h00. During rush hours, trains can become crowded and<br />
passengers may wait to board the next train. The high frequency of our<br />
trains means that passengers need to wait two to three minutes during peak<br />
hours on the Tsuen Wan Line, Kwun Tong Line, Island Line, and Tseung<br />
Kwan O Line and an average of four minutes on the Tung Chung Line. The<br />
Airport Express runs at 10 - 15 minutes interval for the whole day. This level of<br />
service has resulted in consistently high numbers of passengers using the<br />
MTR network (Figure 5.1).<br />
Figure 5.1 �Total Passenger Numbers (1994-2003)<br />
Total no. of passengers (Urban Lines,in<br />
thousands)<br />
850000<br />
800000<br />
750000<br />
700000<br />
650000<br />
600000<br />
550000<br />
500000<br />
Total Urban Lines*<br />
1994<br />
1995<br />
1996<br />
1997<br />
1998<br />
1999<br />
2000<br />
2001<br />
2002<br />
2003<br />
20000<br />
18000<br />
16000<br />
14000<br />
12000<br />
10000<br />
8000<br />
6000<br />
4000<br />
2000<br />
* (Tsuen Wan, Island, Kw un Tong, Tung Chung, and Tseung Kw an O Lines)<br />
0<br />
Airport Express Line<br />
Total no. of passengers (Airport Express<br />
Line, in thousands)<br />
MTR CORPORATION SUSTAINABILITY REPORT 2003<br />
24