17.01.2018 Views

Bay Harbour: June 01, 2016

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Wednesday <strong>June</strong> 1 2<strong>01</strong>6<br />

BAY HARBOUR<br />

PAGE 5<br />

Coastal Pathway progress on target<br />

THE Christchurch<br />

WE<br />

Coastal Infrastructure<br />

ARE<br />

Rebuild Team,<br />

ON THE<br />

Pathway is on track to reach the with involvement<br />

halfway mark by the end of the from the Coastal Pathway<br />

year.<br />

Group.<br />

By December the pathway, Three other sections of the<br />

which will eventually stretch for pathway have already been<br />

6.5km between Ferrymead and completed since work began on<br />

Scarborough Beach, Sumner, the $25 million project in 2003;<br />

should be 3.5km long<br />

MOVE<br />

– or just<br />

AGAIN...<br />

Mt Pleasant Causeway, Main Rd<br />

over halfway.<br />

three laning and Redcliffs Village<br />

(Main Rd to Beachville Rd<br />

The 4m wide route will provide<br />

safe public access along the East to Tramstop), which opened<br />

coastline and aims to protect up the Avon Estuary for walkers<br />

and enhance wildlife habitat in and cyclists in December.<br />

the area.<br />

Four more sections are<br />

Construction is currently underway<br />

on the Beachville Rd section<br />

in Redcliffs, following the<br />

replacement of the earthquakedamaged<br />

500m seawall.<br />

City council project manager<br />

Adrian Thein said work on the<br />

seawall had been challenging,<br />

with a series of temporary “coffer<br />

dams” in place to hold out<br />

seawater allowing the seawall to<br />

be rebuilt.<br />

The wall was now 80 per cent<br />

finished and the next phase<br />

would be building the pathway<br />

itself, installing street lighting<br />

and then landscaping.<br />

The work was on track for<br />

completion in December, Mr<br />

Thein said.<br />

Work on the coastal pathway is<br />

being managed by the city council<br />

and Stronger Christchurch<br />

planned, and developed design<br />

work for these has already been<br />

carried out.<br />

The next phase from Deans<br />

Head to Sumner Surf Life Saving<br />

Club will require resource<br />

consent, but subject to approval,<br />

TO A NEW LOCATION IN<br />

work could start in October this<br />

year.<br />

FERRYMEAD, DUE TO<br />

Coastal Pathway Group chairman<br />

Tim Lindley said he was<br />

excited about the work currently<br />

underway and pleased it was on<br />

schedule.<br />

EARTHQUAKE REPAIRS<br />

The existing sections of pathway<br />

were already well-used, he<br />

said.<br />

“We anticipate when the<br />

pathway is complete it will be<br />

the second most used facility<br />

like this in Christchurch<br />

WATCH<br />

after<br />

THIS SPACE<br />

the Botanic Gardens, which get<br />

about a million visitors a year.”<br />

PHOTO: MARTIN HUNTER<br />

ON TRACK: Mayor Lianne<br />

Dalziel jumped on her<br />

bike in September to<br />

officially open stage<br />

two of the Christchurch<br />

Coastal Pathway. The<br />

sections which have<br />

already been completed<br />

are well used.<br />

WE WELCOME ALL NEW PATIENTS<br />

We will keep you informed as to our<br />

new address.<br />

on the day service whenever possible<br />

arlotte<br />

If you would lIke advIce<br />

and treatment wIth:<br />

• Women’s health • Children’s & teenage health & wellbeing<br />

• Older persons health • Lifestyle advice<br />

• Warrant of fitness checks for men and women<br />

• Helping patients manage long term medical problems<br />

Dr Brendan Smith Dr Charlotte Cooper Dr Gort Stephan Dr David Thomson<br />

If you would lIke advIce and treatment wIth:<br />

• Removal of skin lesions • Sports medicine • Vasectomies<br />

• Occupational and company medicine • Drug testing<br />

• Pre-employment medicals • Stopping smoking support<br />

• Travel vaccinations<br />

• Women’s health • Children’s & teenage health & wellbeing<br />

• Older persons health • Lifestyle advice<br />

• Warrant of fitness checks for men and women<br />

• Helping patients manage long term medical problems<br />

• Removal of skin lesions • Sports medicine • Vasectomies<br />

• Occupational and company medicine • Drug testing<br />

• Pre-employment Gort medicals • Stopping smoking support<br />

• Travel vaccinations<br />

New patients welcome Ph. 384 5484<br />

Ferrymead<br />

MEDICAL<br />

c e n t r e<br />

ferrymead<br />

medIcal centre<br />

YES we are now permanently<br />

located in the new purpose<br />

designed medical facility on<br />

the corner of Waterman Place<br />

& Ferry Rd (next to BNZ and<br />

Café del Mar)<br />

ferrymead medIcal centre<br />

unIt 10/2 waterman Place<br />

Phone 384-5484<br />

Mon to Fri 8.30am-5.30pm

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!