Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Wednesday <strong>June</strong> 1 2<strong>01</strong>6<br />
BAY HARBOUR<br />
PAGE 5<br />
Coastal Pathway progress on target<br />
THE Christchurch<br />
WE<br />
Coastal Infrastructure<br />
ARE<br />
Rebuild Team,<br />
ON THE<br />
Pathway is on track to reach the with involvement<br />
halfway mark by the end of the from the Coastal Pathway<br />
year.<br />
Group.<br />
By December the pathway, Three other sections of the<br />
which will eventually stretch for pathway have already been<br />
6.5km between Ferrymead and completed since work began on<br />
Scarborough Beach, Sumner, the $25 million project in 2003;<br />
should be 3.5km long<br />
MOVE<br />
– or just<br />
AGAIN...<br />
Mt Pleasant Causeway, Main Rd<br />
over halfway.<br />
three laning and Redcliffs Village<br />
(Main Rd to Beachville Rd<br />
The 4m wide route will provide<br />
safe public access along the East to Tramstop), which opened<br />
coastline and aims to protect up the Avon Estuary for walkers<br />
and enhance wildlife habitat in and cyclists in December.<br />
the area.<br />
Four more sections are<br />
Construction is currently underway<br />
on the Beachville Rd section<br />
in Redcliffs, following the<br />
replacement of the earthquakedamaged<br />
500m seawall.<br />
City council project manager<br />
Adrian Thein said work on the<br />
seawall had been challenging,<br />
with a series of temporary “coffer<br />
dams” in place to hold out<br />
seawater allowing the seawall to<br />
be rebuilt.<br />
The wall was now 80 per cent<br />
finished and the next phase<br />
would be building the pathway<br />
itself, installing street lighting<br />
and then landscaping.<br />
The work was on track for<br />
completion in December, Mr<br />
Thein said.<br />
Work on the coastal pathway is<br />
being managed by the city council<br />
and Stronger Christchurch<br />
planned, and developed design<br />
work for these has already been<br />
carried out.<br />
The next phase from Deans<br />
Head to Sumner Surf Life Saving<br />
Club will require resource<br />
consent, but subject to approval,<br />
TO A NEW LOCATION IN<br />
work could start in October this<br />
year.<br />
FERRYMEAD, DUE TO<br />
Coastal Pathway Group chairman<br />
Tim Lindley said he was<br />
excited about the work currently<br />
underway and pleased it was on<br />
schedule.<br />
EARTHQUAKE REPAIRS<br />
The existing sections of pathway<br />
were already well-used, he<br />
said.<br />
“We anticipate when the<br />
pathway is complete it will be<br />
the second most used facility<br />
like this in Christchurch<br />
WATCH<br />
after<br />
THIS SPACE<br />
the Botanic Gardens, which get<br />
about a million visitors a year.”<br />
PHOTO: MARTIN HUNTER<br />
ON TRACK: Mayor Lianne<br />
Dalziel jumped on her<br />
bike in September to<br />
officially open stage<br />
two of the Christchurch<br />
Coastal Pathway. The<br />
sections which have<br />
already been completed<br />
are well used.<br />
WE WELCOME ALL NEW PATIENTS<br />
We will keep you informed as to our<br />
new address.<br />
on the day service whenever possible<br />
arlotte<br />
If you would lIke advIce<br />
and treatment wIth:<br />
• Women’s health • Children’s & teenage health & wellbeing<br />
• Older persons health • Lifestyle advice<br />
• Warrant of fitness checks for men and women<br />
• Helping patients manage long term medical problems<br />
Dr Brendan Smith Dr Charlotte Cooper Dr Gort Stephan Dr David Thomson<br />
If you would lIke advIce and treatment wIth:<br />
• Removal of skin lesions • Sports medicine • Vasectomies<br />
• Occupational and company medicine • Drug testing<br />
• Pre-employment medicals • Stopping smoking support<br />
• Travel vaccinations<br />
• Women’s health • Children’s & teenage health & wellbeing<br />
• Older persons health • Lifestyle advice<br />
• Warrant of fitness checks for men and women<br />
• Helping patients manage long term medical problems<br />
• Removal of skin lesions • Sports medicine • Vasectomies<br />
• Occupational and company medicine • Drug testing<br />
• Pre-employment Gort medicals • Stopping smoking support<br />
• Travel vaccinations<br />
New patients welcome Ph. 384 5484<br />
Ferrymead<br />
MEDICAL<br />
c e n t r e<br />
ferrymead<br />
medIcal centre<br />
YES we are now permanently<br />
located in the new purpose<br />
designed medical facility on<br />
the corner of Waterman Place<br />
& Ferry Rd (next to BNZ and<br />
Café del Mar)<br />
ferrymead medIcal centre<br />
unIt 10/2 waterman Place<br />
Phone 384-5484<br />
Mon to Fri 8.30am-5.30pm