Nor'West News: April 24, 2018
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
NOR’WEST NEWS Latest Christchurch news at www.star.kiwi<br />
Tuesday <strong>April</strong> <strong>24</strong> <strong>2018</strong> 3<br />
<strong>News</strong><br />
More delays for Aurora Centre<br />
• By Julia Evans<br />
UNFORESEEN fire compliance<br />
issues have again delayed<br />
the Aurora Performing Arts<br />
Centre’s reopening.<br />
Earthquake repairs,<br />
refurbishment and upgrades<br />
have been ongoing since<br />
January and were expected to<br />
be completed by February to<br />
minimise impact on Burnside<br />
High School students.<br />
The reopening was delayed<br />
until March,<br />
but it has now<br />
been revealed<br />
the centre<br />
won’t open<br />
until May.<br />
“Due to the<br />
complexity of<br />
this work, plus<br />
unforeseen<br />
compliance Phil Holstein<br />
issues with new<br />
fire regulations, the Aurora<br />
Centre will not be available for<br />
school use until the beginning<br />
of term two,” principal Phil<br />
Holstein said in a report.<br />
He said work on the exterior<br />
of the building would continue<br />
until November.<br />
The performing arts centre,<br />
on the site of Burnside High<br />
School, has been undergoing<br />
weather tightness and<br />
earthquake damage repairs.<br />
UPGRADE: The reopening of the Aurora Performing Arts Centre at Burnside High School has<br />
been delayed again.<br />
PHOTO: MARTIN HUNTER<br />
Mr Holstein told Nor’West<br />
<strong>News</strong> while the repair work<br />
was going on, the school was<br />
also taking the opportunity to<br />
spend time doing “necessary”<br />
upgrades to the centre.<br />
The school has spent $2<br />
million on the upgrades, which<br />
include a new air-conditioning<br />
system and refreshing the paint<br />
job on the building’s exterior,<br />
as well as some smaller internal<br />
work.<br />
“It was definitely time to<br />
upgrade . . . I’d heard from a<br />
few people the heating and<br />
cooling definitely needed work<br />
on it,” Mr Holstein said. He said<br />
with construction of this type,<br />
you always anticipate delays.<br />
Work on the 700-seat centre<br />
is part of a $<strong>24</strong> million repair<br />
and redevelopment plan at the<br />
school, which includes several<br />
of the school’s other buildings.<br />
Once completed, Mr Holstein<br />
said the board would be able<br />
to begin “the master planning<br />
stage” of the school’s postquake<br />
redevelopment.<br />
Mr Holstein said the upgrade<br />
work on the Aurora Centre<br />
is not only important to the<br />
school, but also to the wider<br />
community, as the building<br />
filled a key role following the<br />
February 22, 2011, earthquake.<br />
It was one of the only venues<br />
to host events left in the city.<br />
“It’s a significant building for<br />
Burnside but also for the city<br />
post-quake ,” Mr Holstein said.<br />
Local<br />
<strong>News</strong><br />
Now<br />
In Brief<br />
Fire rages, homes at risk<br />
NORTHERN CORRIDOR PLAN<br />
The plan to manage the downstream<br />
traffic effects of the northern corridor<br />
along Bealey Ave into the city will go<br />
out for public consultation in May.<br />
City council manager planning and<br />
delivery transport Lynette Ellis said it<br />
is expected the plan will be ready for<br />
city council endorsement towards the<br />
end of the year.<br />
RICHMOND ROAD WORKS<br />
City council staff are looking at<br />
hosting a community meeting to<br />
inform residents about the timeline<br />
and progress of road works in<br />
Richmond. Work has been heavy in<br />
the area around Hills Rd, Shirley Rd,<br />
North Avon Rd and North Parade.<br />
The community meeting would<br />
include information on the current<br />
state of roads within that area and the<br />
prioritisation of any street renewals<br />
and repairs.<br />
GROUPS THANK BOARD<br />
Several groups have written to the<br />
Fendalton-Waimairi-Harewood Community<br />
Board to thank it for funding.<br />
They included St Barnabas Church,<br />
the Bishopdale Community Trust,<br />
the Bryndwr Community Garden,<br />
Burnside Community Transformation<br />
Trust, Burnside Elim Church<br />
Trust, Burnside Rugby Football<br />
Club, Christchurch Chinese Church,<br />
Fendalton Bowling Club, St Aiden’s<br />
Anglican Church, St Christopher’s<br />
Anglican Church, The Merevale Corner<br />
and Te Ora Hou Otautahi.<br />
WWW .VI S I O N C O LLE G E.CO. N Z<br />
LEARN<br />
MODERN OFFICE<br />
COMPUTER SKILLS<br />
FREE 20 week course.<br />
NZ Certificate in Business (Admin & Computing).<br />
This course will cover Windows 10 and Microsoft Office<br />
(Word, Excel and Publisher). Taught within a business context,<br />
this programme will prepare you for the modern office.<br />
Hours are flexible and can include night classes.<br />
Struggling to see<br />
with your dim lights?<br />
Get switchedon<br />
Upgrade your old power hungry halogen downlights<br />
• Switch to LED for sleek long lasting efficient lighting<br />
• 70% saving on power for lighting<br />
nova Series LEd<br />
Fixed Recessed<br />
downlights<br />
Replace 4 downlights<br />
$<strong>24</strong>0 + GSt<br />
✓ Security and landscape lighting<br />
✓ Pre purchase/Insurance Electrical Inspections<br />
✓ Replace tired/old existing switches sockets<br />
✓ Switchboard Upgrades<br />
✓ House Rewires<br />
ContaCt US today!<br />
ENROL<br />
NOW<br />
PHONE US NOW ON:<br />
0800 834 834<br />
txt OFFICE to 027 557 8839<br />
COLLEGE<br />
50 Hazeldean Rd,<br />
Addington, Christchurch<br />
A division of ATC New Zealand. (Est 1984). NZQA Accredited.<br />
<strong>24</strong> Frank Coxon Road, Belfast, Christchurch<br />
03 373 8320 • info@switchedon.net.nz<br />
www.switchedon.net.nz