13.06.2018 Views

WIR 02/2018 [EN]

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

22 International Projects<br />

Fifty-percent capacity increase<br />

with the areitXpress<br />

The new 10-passenger D-Line gondola<br />

lift up to the Schmitten in Zell am See offers<br />

modern technology in a stylish look.<br />

For the oldest ski area in Austria’s Salzburgerland<br />

province, being state of the art goes without<br />

saying. In collaboration with long-standing<br />

partner Doppelmayr, the Schmitten operating<br />

company in Zell am See therefore built the<br />

areit Xpress – a modern D-Line lift that combines<br />

top comfort with a short trip time. Passengers<br />

benefit from level access to the cabins. The<br />

latest-generation ropeway also impresses with<br />

a host of comfort features such as more legroom,<br />

wider, comfortable seats and free WiFi<br />

in the cabins. Behind the scenes, the Doppelmayr<br />

Connect control system ensures smooth<br />

operations. “One of the things that impressed<br />

us was the deactivation concept integrated<br />

into the control system. In the event of a sensor<br />

malfunction, this enables us to continue operating<br />

with a functional main drive, rather than<br />

the emergency drive,” explains Hannes Mayer,<br />

technical director of Schmittenhöhebahn<br />

AG. The transport capacity of the new lift is<br />

50 percent higher than that of its predecessor<br />

– up to 3,600 passengers an hour can now be<br />

carried up and downhill. With the areitXpress,<br />

guests can swiftly access the ski area from the<br />

Schüttdorf district and waiting times have finally<br />

become a thing of the past. Once at the top<br />

station, guests can either travel on to a wide<br />

range of ski trails using other lifts or ski back<br />

down into the valley. And if they prefer to take<br />

time out to relax, they can head for the Areit-<br />

Lounge or the AreitAlm.<br />

Long established and modern<br />

As long ago as 1927, the Schmittenhöhe lift<br />

was the region’s first ropeway to go into operation.<br />

Schmittenhöhebahn AG has been<br />

working with Doppelmayr on the Areit for<br />

30 years. In addition to cutting-edge technology,<br />

the operating company attaches great importance<br />

to sustainability when building lifts. The<br />

stations blend in harmoniously with the natural<br />

landscape. For the areitXpress, the main building<br />

of the bottom station was modernized and<br />

equipped with an innovative membrane roof. |<br />

Owner<br />

Location<br />

Inclined length<br />

Vertical rise<br />

Capacity<br />

Speed<br />

Trip time<br />

Carriers<br />

“Doppelmayr Connect is really<br />

user-friendly. The extensive<br />

functionality makes life easier<br />

for us and ensures maximum<br />

safety for our guests.”<br />

Hannes Mayer,<br />

Technical Director,<br />

10-MGD areitXpress<br />

Schmittenhöhebahn AG<br />

Schmittenhöhebahn AG<br />

Zell am See, Salzburg<br />

(AUT)<br />

1,812 m<br />

634 m<br />

3,600 PPH<br />

6.0 m/s<br />

7.12 min<br />

85 10-passenger cabins<br />

Start-up November 30, 2017<br />

Ropeway generation D-Line

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!