15.12.2012 Views

Hot Runners and Mould Components - ETMM-Online

Hot Runners and Mould Components - ETMM-Online

Hot Runners and Mould Components - ETMM-Online

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

“With our old system,” recalls<br />

Gauch, “starting at this point, we<br />

introduced the shelf system <strong>and</strong><br />

flooded production with work<br />

plans. Basically, we started with<br />

parallel systems. On the one side<br />

we had sales doing bid estimates,<br />

<strong>and</strong> on the other side we had the<br />

work-planning department creating<br />

work plans for production.”<br />

Reaping Benefits<br />

These days, Pfletschinger & Gauch<br />

is better able to estimate each<br />

department’s workload, <strong>and</strong> scheduling<br />

<strong>and</strong> deadline management<br />

has become much more transparent.<br />

Moreover, production, as well<br />

as work planning, has become<br />

more manageable, reliable <strong>and</strong><br />

clearly defined. Material flow in<br />

production is greatly improved,<br />

thanks to the work plans <strong>and</strong> shelf<br />

system. The company thus gets<br />

fewer follow-up questions <strong>and</strong><br />

www.etmm-online.com | May 2011 | European Tool & <strong>Mould</strong> Making<br />

encounters fewer misunderst<strong>and</strong>ings<br />

<strong>and</strong> other problems, thereby<br />

lowering costs.<br />

The software improved transparency<br />

noticeably not only for<br />

the workers but also for management<br />

<strong>and</strong> company administrators.<br />

The project management<br />

team now can use <strong>and</strong> learn from<br />

information gained from records<br />

of the length of time projects take.<br />

“Our work plans include all<br />

of the information necessary for<br />

production,” says Rol<strong>and</strong> Pfletschinger.<br />

“We decided to include the<br />

duration estimated by the workplanning<br />

department on the work<br />

plans in order to improve planning<br />

reliability.”<br />

Master Wolfgang Haible says he<br />

finds that the overview at a glance<br />

is a very useful tool. This element<br />

of the software shows what tool<br />

components are located in which<br />

department <strong>and</strong> what work procedures<br />

need to be performed at<br />

» Segoni AG<br />

Berlin, Germany<br />

www.segoni.de<br />

Case Studies<br />

which time. In addition, a toolmaker<br />

is able to access information<br />

about the status of mechanical<br />

production from a production<br />

terminal at any time.<br />

Transferring tasks between the<br />

two masters employed by Pfletschinger<br />

& Gauch, when one is on<br />

holiday for example, is now much<br />

simpler. Pfletschinger explains:<br />

“Previously, we would meet several<br />

days in advance <strong>and</strong> write lists.<br />

Now we use the data to discuss two<br />

or three critical projects, <strong>and</strong> the<br />

rest is already documented.”<br />

The company’s two directors<br />

have concluded that, even though<br />

a few kinks still need working out,<br />

Pfletschinger & Gauch is definitely<br />

on the right path <strong>and</strong> is benefiting<br />

every day from its decision to go<br />

with Segoni.<br />

The world of metalworking<br />

INFO:<br />

VDW – Generalkommissariat EMO Hannover 2011<br />

Verein Deutscher Werkzeugmaschinenfabriken e.V.<br />

Corneliusstrasse 4, 60325 Frankfurt am Main, GERMANY<br />

Tel. +49 69 756081-0, Fax +49 69 756081-74<br />

emo@vdw.de · www.emo-hannover.de<br />

33

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!