Kingspan TEK offers speedy fit<br />
Off-site construction has facilitated the quick erection of an Early<br />
Years Centre for Surrey Square Primary School, an Ofsted<br />
‘Outstanding’ school. The building envelope was successfully<br />
completed in just over two weeks, with the help of the Kingspan<br />
TEK Building System of structural insulated panels (SIPs).<br />
420m 2 of the Kingspan TEK Building System in 142mm thickness<br />
were specified for the walls and roof of the new centre, fixed to<br />
the glulam frame on the walls and roof, providing a secure<br />
building envelope that was then sealed with a breather membrane<br />
to make it watertight. Following this, the rooflights were installed<br />
down the centre of the roof and the Kingspan TEK panels clad<br />
with western red cedar shingles creating a visually striking<br />
aesthetic.<br />
With their high-performance insulation core, SIPs achieve U-<br />
values of 0.20 W/m 2 .K or better.<br />
www.kingspantek.co.uk<br />
Final modules for free school<br />
Offsite construction specialist The McAvoy Group has craned the<br />
final modules into position on site at the new Concordia Academy<br />
in Romford for a new £8.2m building to accommodate 630<br />
primary school children. The structure for the 2972m2 free school<br />
was manufactured offsite by McAvoy, using the latest modular<br />
technology to reduce the build programme, minimise disruption,<br />
and improve quality.<br />
The building was craned into position as 67 steel-framed building<br />
modules in just 12 days, on the site of a former nurses’ home in<br />
Romford. A 300-tonne crane was used for the modules which are<br />
up to 16.5m long and weigh up to 17 tonnes.<br />
Funded by the DfE via the Education and Skills Funding Agency,<br />
and designed by Blue Sky Architects, the new academy will create<br />
an exemplar learning environment for local children, and muchneeded<br />
primary school places.<br />
www.mcavoygroup.com<br />
Caledonian’s SMART construction solution<br />
Caledonian’s SMART construction solution is being chosen by a growing number of<br />
architects and educational establishments because it allows the majority of the build to<br />
be completed off-site.<br />
Designed and built to an exacting specification, 90% + of your project is done in our factory<br />
controlled environment, unaffected by the weather, and subject to strict quality, cost and<br />
programme controls. This applies to new classrooms, communal areas, and other facilities.<br />
Either a whole school or the development of an existing one, our solution is designed to<br />
stand alone or fit seamlessly sympathetically alongside existing buildings, with a variety of<br />
finish options.<br />
The Caledonian volumetric off-site solution provides clear benefits when compared to on-site traditional methods of construction:<br />
• Safer - expansion projects can be completed within the school holiday window, with a lack of impact on the functioning of the educational<br />
facility itself, local roads infrastructure and the neighbouring community.<br />
• More sustainable- off-site construction generates significantly less waste and enables better waste management.<br />
• Reduced working at height – a direct improvement on health & safety.<br />
• Environmentally more superior to using traditional materials, (which have a high % of materials that are spoiled, stolen, lost – needing to be<br />
replaced).<br />
• Programme – off-site construction removes variables such as labour availability and weather, resulting in more predictable programmes, on<br />
time and to schedule (only 63 per cent of traditional site-based construction projects are delivered on time and only 49 per cent delivered to<br />
budget).<br />
• Cost – predictable and repeatable processes result in accurate cost forecasts and delivery within budget<br />
• Performance in use – Improved quality control and construction tolerances improves Ongoing building efficiency and reduces future<br />
maintenance.<br />
In partnership with HLM Architects, Caledonian is an approved supplier on the £50m Education Skills Funding Agency (ESFA) Framework<br />
working with HLM to design and build for schools, academies, and other educational facilities. The Framework, which falls under the second<br />
wave of P<strong>SB</strong>P (Priority School Building Programme), went launched in August 2017 for a period of up to 4 years.<br />
Working either as Principal Contractor/Lead Designer or as a specialist Subcontractor, we have the capability to deliver projects from conception<br />
through to handover from the single largest offsite manufacturing facility in the UK.<br />
To find out more about the full range of education building programmes from Caledonian,<br />
call: 01636 821645 or visit the website.<br />
www.caledonianmodular.com<br />