30.10.2018 Views

Building Investment (September - October 2018)

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

OUTLOOK<br />

<br />

<br />

<br />

<br />

<br />

5% to 10%<br />

<br />

<br />

<br />

6% to 7% of the<br />

(Table 2). <br />

<br />

.<br />

AGENCY REQUIREMENT CONTRIBUTION CHARGES<br />

Tenaga National<br />

Berhad (TNB)<br />

<br />

TNB substation<br />

<br />

substation and surrender<br />

it to TNB on upon<br />

<br />

Type<br />

Single phase<br />

<br />

Three phase<br />

<br />

Three phase<br />

(underground)<br />

Charge per<br />

premise (RM)<br />

<br />

<br />

<br />

Indah Water<br />

<br />

<br />

needs upgrade or<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

×<br />

<br />

Type<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Charge per<br />

premise (RM)<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

install high-speed broadband<br />

<br />

Table 2: Utilities contribution by developer.<br />

<br />

<br />

500 units of <br />

RM250,000 for each<br />

36 <strong>Building</strong> & <strong>Investment</strong> | www.b-i.biz

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!