Building Investment (September - October 2018)
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
OUTLOOK<br />
<br />
<br />
<br />
<br />
<br />
5% to 10%<br />
<br />
<br />
<br />
6% to 7% of the<br />
(Table 2). <br />
<br />
.<br />
AGENCY REQUIREMENT CONTRIBUTION CHARGES<br />
Tenaga National<br />
Berhad (TNB)<br />
<br />
TNB substation<br />
<br />
substation and surrender<br />
it to TNB on upon<br />
<br />
Type<br />
Single phase<br />
<br />
Three phase<br />
<br />
Three phase<br />
(underground)<br />
Charge per<br />
premise (RM)<br />
<br />
<br />
<br />
Indah Water<br />
<br />
<br />
needs upgrade or<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
×<br />
<br />
Type<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
Charge per<br />
premise (RM)<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
install high-speed broadband<br />
<br />
Table 2: Utilities contribution by developer.<br />
<br />
<br />
500 units of <br />
RM250,000 for each<br />
36 <strong>Building</strong> & <strong>Investment</strong> | www.b-i.biz