08.01.2019 Views

AP Report 2019-final

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

A techno-economic feasibility report is to<br />

be undertaken by the State Government.<br />

For Vijayawada, Memorandum of<br />

Understanding has been signed by Airports<br />

Authority of India with Government of<br />

Andhra Pradesh to develop the existing<br />

terminal. The State is to acquire 698 acres<br />

of land required for the expansion as per<br />

the standard terms. The State Government<br />

provided the necessary Viability Gap<br />

Funding (VGF) and international flights<br />

have commenced operation from 04<br />

December 2018.<br />

In Tirupati, the new terminal was<br />

inaugurated by the Prime Minister on 22<br />

October 2015. A new apron for parking<br />

for 3 aircraft has been completed. The<br />

existing runway, apron and terminal building<br />

are adequate for commencing international<br />

flights. Expansion of new apron for parking<br />

additional 4 aircraft and isolation bay is<br />

under construction within the available land.<br />

The State Government’s request to<br />

accord the status of ‘Port of Call’ to<br />

Vijayawada and Tirupati airports may be<br />

conceded by including them in existing<br />

bilateral agreements.<br />

(iii) Metro Rail facility in Visakhapatnam<br />

and Vijayawada-Guntur-Tenali<br />

Metropolitan Urban Development<br />

Authority<br />

Status <strong>Report</strong> - Union’s Commitment to Andhra Pradesh<br />

Government of India Commitment:<br />

Section 93 – Schedule 13 – Infrastructure<br />

item 12.<br />

“12. The Government of India shall<br />

examine the feasibility of Metro Rail<br />

facility in Vishakhapatnam and<br />

Vijayawada-Guntur-Tenali<br />

Metropolitan Urban Development<br />

Authority within period of one year<br />

from the appointed day and take an<br />

expeditious decision thereon.”<br />

The Government of India is actively considering<br />

proposals for the establishment of the Metro<br />

Rail in Visakhapatnam and Vijayawada-<br />

Guntur-Tenali urban area.<br />

Vijayawada Metro Rail Project: 11<br />

Government of India has accorded in-principle<br />

approval for Vijayawada Metro Rail Project at<br />

a cost of Rs. 6769 Crore including land and<br />

R&R cost.<br />

Pre-PIB meeting queries have been answered<br />

and the matter was placed before PIB meeting<br />

for clearance on 20 March 2017. The matter<br />

was returned by Government of India for<br />

resubmission based on the new Metro Rail<br />

Policy.<br />

However, consequent to the returning of the<br />

proposal by Government of India clubbed with<br />

the discharge of the tenders by Delhi Metro Rail<br />

Corporation Ltd. (DMRC), the matter was<br />

11<br />

Source: aplegislature.org/...on...<strong>AP</strong>...pdf/b706a359-1eac-46eaa73f-6dfd35 a6dfd7 (Downloaded on 29 05 201)<br />

- 75 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!