29.01.2019 Views

Staatsolie Annual Report 2017

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Annual</strong> <strong>Report</strong> <strong>2017</strong> 17<br />

PSCs as at year end <strong>2017</strong> (operators noted in red text).<br />

Offshore block progress and plans for 2018/2019:<br />

<strong>2017</strong> activity Plans for 2018/2019<br />

Block 42<br />

Block 45<br />

Block 47<br />

Processing of 3D data acquired and<br />

evaluation ongoing.<br />

Upgraded prospect and got partner<br />

approval to enter the next phase of the<br />

exploration.<br />

Ratio farmed into block and has a<br />

participating interest of 20%. Tullow<br />

operator with remaining interest of 80%.<br />

Possible drilling of an exploration well in<br />

2018.<br />

Commitment to drill an exploration well in<br />

the second quarter of 2018.<br />

Tullow to secure an additional partner and<br />

enter second phase of exploration.<br />

Block 48<br />

Commenced 3D seismic in December<br />

<strong>2017</strong>.<br />

Data processing and farming down<br />

interest.<br />

Block 52 Post Roselle well evaluation ongoing. Plans subject to well evaluation results.<br />

Block 53 Kolibrie-1 well drilled in the first quarter. Prepare for drilling in 2019.<br />

Block 54 Araku well drilled in fourth quarter. Review and analyze results.<br />

Block 58 Processing of 3D data acquired in 2016<br />

and ongoing evaluation of block.<br />

Prepare for drilling in 2019.<br />

Block 60 2D seismic commenced in December. Seismic analysis.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!