You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
PEGASUS POST Latest Christchurch news at www.star.kiwi<br />
Tuesday <strong>March</strong> 5 <strong>2019</strong> 3<br />
News<br />
Two-year wait for road repairs<br />
• By Matt Slaughter<br />
ROAD USERS in the east will<br />
have to wait another two years<br />
for one of the area’s most badly<br />
damaged roads to be repaired.<br />
THe city council has confirmed<br />
the repair to New Brighton Rd<br />
between Bower Ave and the<br />
Pages Rd roundabout will take<br />
place in 2020-21 at a cost of<br />
about $1.2 million.<br />
Members of<br />
the Coastal-<br />
Burwood<br />
Community<br />
Board said this<br />
is too long to<br />
wait and they<br />
Kim Money<br />
would continue<br />
to put pressure<br />
on the city<br />
council to start work now.<br />
Deputy chairman Tim Sintes<br />
said the community board’s<br />
concerns about the state of the<br />
stretch of road would continue<br />
to be raised in its meetings until<br />
the city council did something<br />
about it.<br />
“It won’t go away until it’s<br />
fixed. The community board’s<br />
members like myself and others<br />
get it coming to us all the time,<br />
so we’ll just keep bringing it up<br />
all the time.”<br />
Board chairwoman Kim<br />
Money said: “We just need to<br />
be seeing some action because<br />
it is seriously affecting the wellbeing<br />
of our residents. A lot of<br />
these earthquake repairs that<br />
we haven’t seen for the last eight<br />
years are attached to the wellbeing<br />
of the community.<br />
“On a daily basis, we are<br />
seeing these repairs that haven’t<br />
been done and that’s really<br />
hard, so for us to be able to move<br />
these things forward would be<br />
good.”<br />
Ms Money said the stretch of<br />
road was an “absolute disgrace.”<br />
“THere’s plenty of potholes,<br />
bumpy road dips and water<br />
flooding on it . . . the pothole<br />
people must be in there virtually<br />
every week filling potholes.”<br />
THe city council has also said<br />
the project won’t include the<br />
repair of the Cockayne Reserve<br />
car park.<br />
Ms Money said the car park<br />
had been used as a dumping<br />
ground by contractors and it was<br />
common for shingle and metal<br />
to be dumped there.<br />
UNEVEN:<br />
Road users<br />
will have to<br />
wait another<br />
two years for<br />
New Brighton<br />
Rd between<br />
Bower Ave and<br />
the Pages Rd<br />
roundabout to<br />
be fixed.<br />
“It really is an eyesore … it<br />
really is just not fair for the<br />
residents and the shops and<br />
retailers in that area.”<br />
Mr Sintes said the community<br />
board had been calling for New<br />
Brighton Rd to be repaired<br />
since the February 22, 2011,<br />
earthquake and another twoyear<br />
delay would be a huge blow<br />
for residents.<br />
“New Brighton Rd has been<br />
on the agenda for so long and<br />
it’s just so disappointing to see it<br />
taking this long.”<br />
Local<br />
News<br />
Now<br />
In Brief<br />
Fire rages, homes at risk<br />
CONSENT FOR CAR PARK<br />
A new car park will be<br />
constructed at Thomson Park<br />
on Marine Pde. Resource<br />
consent has been approved and<br />
the project will be completed<br />
by June. The new car park is<br />
part of a project to renew the<br />
facilities in the park. A new<br />
public toilet was installed in<br />
December and the project will<br />
also involve the installation<br />
of a new basketball court and<br />
the completion of landscaping<br />
work. Meanwhile, a project to<br />
repair earthquake damage in<br />
Bexley Park will get under way<br />
this month. The car park will<br />
be replaced, upgrades will be<br />
made to the track connecting<br />
the car park and toilet, and a<br />
damaged footbridge will be<br />
removed.<br />
BUS STOP UPGRADE<br />
The <strong>Pegasus</strong> <strong>Post</strong> reported<br />
last week the Papanui-<br />
Innes Community Board<br />
had approved a proposal to<br />
upgrade the bus stop and<br />
shelter on Shirley Rd in<br />
front of the Palms Shopping<br />
Centre. The proposal was not<br />
approved and actually only<br />
considered and was discussed<br />
at a meeting on February 22<br />
rather than February 18, as<br />
was first reported.<br />
SUPER DEALS<br />
Milk 2L<br />
2 for $6<br />
Coke Range 1.5L<br />
2 for $6<br />
V Range<br />
350ml Bottles<br />
2 for $6<br />
City Express Discounter<br />
724 Gloucester St (near Woodham Rd)<br />
Ph 381 7437 | Open 7 Days<br />
Best Buys<br />
FOR MARCH<br />
Seagers Gin<br />
Range 1L or<br />
Ivanov Vodka<br />
$33.99<br />
Big Bargain<br />
Book<br />
Sale<br />
Friday 22 <strong>March</strong><br />
9am–7pm<br />
Saturday 23 <strong>March</strong><br />
9am–4pm<br />
Pioneer Recreation<br />
and Sport Centre<br />
75 Lyttelton Street<br />
Spreydon<br />
We’d like your feedback<br />
on our activities,<br />
spending and funding<br />
for <strong>2019</strong>–20<br />
Our Draft Annual Plan is open for your<br />
feedback from 1 <strong>March</strong>–1 April<br />
HAVE YOUR SAY<br />
ccc.govt.nz/haveyoursay<br />
Cody’s Bourbon<br />
& Cola 7%<br />
12 x 250ml cans<br />
$21.99<br />
Woodham Rd<br />
LIQUOR STORE<br />
Open 7 Days<br />
Riverstone Wine Range<br />
750ml<br />
$8.99<br />
Ph. 381 4110 191 Woodham Rd<br />
(Near Gloucester St) Linwood