03.03.2019 Views

Pegasus Post: March 05, 2019

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PEGASUS POST Latest Christchurch news at www.star.kiwi<br />

Tuesday <strong>March</strong> 5 <strong>2019</strong> 3<br />

News<br />

Two-year wait for road repairs<br />

• By Matt Slaughter<br />

ROAD USERS in the east will<br />

have to wait another two years<br />

for one of the area’s most badly<br />

damaged roads to be repaired.<br />

THe city council has confirmed<br />

the repair to New Brighton Rd<br />

between Bower Ave and the<br />

Pages Rd roundabout will take<br />

place in 2020-21 at a cost of<br />

about $1.2 million.<br />

Members of<br />

the Coastal-<br />

Burwood<br />

Community<br />

Board said this<br />

is too long to<br />

wait and they<br />

Kim Money<br />

would continue<br />

to put pressure<br />

on the city<br />

council to start work now.<br />

Deputy chairman Tim Sintes<br />

said the community board’s<br />

concerns about the state of the<br />

stretch of road would continue<br />

to be raised in its meetings until<br />

the city council did something<br />

about it.<br />

“It won’t go away until it’s<br />

fixed. The community board’s<br />

members like myself and others<br />

get it coming to us all the time,<br />

so we’ll just keep bringing it up<br />

all the time.”<br />

Board chairwoman Kim<br />

Money said: “We just need to<br />

be seeing some action because<br />

it is seriously affecting the wellbeing<br />

of our residents. A lot of<br />

these earthquake repairs that<br />

we haven’t seen for the last eight<br />

years are attached to the wellbeing<br />

of the community.<br />

“On a daily basis, we are<br />

seeing these repairs that haven’t<br />

been done and that’s really<br />

hard, so for us to be able to move<br />

these things forward would be<br />

good.”<br />

Ms Money said the stretch of<br />

road was an “absolute disgrace.”<br />

“THere’s plenty of potholes,<br />

bumpy road dips and water<br />

flooding on it . . . the pothole<br />

people must be in there virtually<br />

every week filling potholes.”<br />

THe city council has also said<br />

the project won’t include the<br />

repair of the Cockayne Reserve<br />

car park.<br />

Ms Money said the car park<br />

had been used as a dumping<br />

ground by contractors and it was<br />

common for shingle and metal<br />

to be dumped there.<br />

UNEVEN:<br />

Road users<br />

will have to<br />

wait another<br />

two years for<br />

New Brighton<br />

Rd between<br />

Bower Ave and<br />

the Pages Rd<br />

roundabout to<br />

be fixed.<br />

“It really is an eyesore … it<br />

really is just not fair for the<br />

residents and the shops and<br />

retailers in that area.”<br />

Mr Sintes said the community<br />

board had been calling for New<br />

Brighton Rd to be repaired<br />

since the February 22, 2011,<br />

earthquake and another twoyear<br />

delay would be a huge blow<br />

for residents.<br />

“New Brighton Rd has been<br />

on the agenda for so long and<br />

it’s just so disappointing to see it<br />

taking this long.”<br />

Local<br />

News<br />

Now<br />

In Brief<br />

Fire rages, homes at risk<br />

CONSENT FOR CAR PARK<br />

A new car park will be<br />

constructed at Thomson Park<br />

on Marine Pde. Resource<br />

consent has been approved and<br />

the project will be completed<br />

by June. The new car park is<br />

part of a project to renew the<br />

facilities in the park. A new<br />

public toilet was installed in<br />

December and the project will<br />

also involve the installation<br />

of a new basketball court and<br />

the completion of landscaping<br />

work. Meanwhile, a project to<br />

repair earthquake damage in<br />

Bexley Park will get under way<br />

this month. The car park will<br />

be replaced, upgrades will be<br />

made to the track connecting<br />

the car park and toilet, and a<br />

damaged footbridge will be<br />

removed.<br />

BUS STOP UPGRADE<br />

The <strong>Pegasus</strong> <strong>Post</strong> reported<br />

last week the Papanui-<br />

Innes Community Board<br />

had approved a proposal to<br />

upgrade the bus stop and<br />

shelter on Shirley Rd in<br />

front of the Palms Shopping<br />

Centre. The proposal was not<br />

approved and actually only<br />

considered and was discussed<br />

at a meeting on February 22<br />

rather than February 18, as<br />

was first reported.<br />

SUPER DEALS<br />

Milk 2L<br />

2 for $6<br />

Coke Range 1.5L<br />

2 for $6<br />

V Range<br />

350ml Bottles<br />

2 for $6<br />

City Express Discounter<br />

724 Gloucester St (near Woodham Rd)<br />

Ph 381 7437 | Open 7 Days<br />

Best Buys<br />

FOR MARCH<br />

Seagers Gin<br />

Range 1L or<br />

Ivanov Vodka<br />

$33.99<br />

Big Bargain<br />

Book<br />

Sale<br />

Friday 22 <strong>March</strong><br />

9am–7pm<br />

Saturday 23 <strong>March</strong><br />

9am–4pm<br />

Pioneer Recreation<br />

and Sport Centre<br />

75 Lyttelton Street<br />

Spreydon<br />

We’d like your feedback<br />

on our activities,<br />

spending and funding<br />

for <strong>2019</strong>–20<br />

Our Draft Annual Plan is open for your<br />

feedback from 1 <strong>March</strong>–1 April<br />

HAVE YOUR SAY<br />

ccc.govt.nz/haveyoursay<br />

Cody’s Bourbon<br />

& Cola 7%<br />

12 x 250ml cans<br />

$21.99<br />

Woodham Rd<br />

LIQUOR STORE<br />

Open 7 Days<br />

Riverstone Wine Range<br />

750ml<br />

$8.99<br />

Ph. 381 4110 191 Woodham Rd<br />

(Near Gloucester St) Linwood

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!