Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Short Lead Times Medium Lead Times Long Lead Times<br />
o<br />
New and fashion<br />
trends are<br />
manufactured in<br />
close proximity of<br />
the retailer (within<br />
the UK), as the<br />
products will only<br />
take 2-3 weeks to<br />
get to the retailer.<br />
Only small<br />
quantities are<br />
manufactured as<br />
different products<br />
will come in trend.<br />
o<br />
o<br />
Classic products are<br />
manufactured in<br />
Europe in countries<br />
like; Turkey,<br />
Portugal as well as<br />
some countries in<br />
North Africa like<br />
Tunisia and<br />
Morocco. It takes<br />
take up to 3 months<br />
lead times with<br />
trucks taking 2<br />
weeks from the<br />
factory to the<br />
warehouses in the<br />
UK.<br />
It is more expensive<br />
to make than the<br />
Far East due to the<br />
increased labour<br />
costs.<br />
o<br />
Core products are<br />
manufactured in<br />
Far East in<br />
countries like in;<br />
China, Bangladesh<br />
and Cambodia. It<br />
takes up to a<br />
minimum of 5-6<br />
months lead times<br />
with 6 weeks of<br />
shipping or 2<br />
weeks of airfreight<br />
but the services is<br />
expensive.<br />
Garment<br />
Manufacture<br />
Lead Times<br />
Contents