Short Lead Times Medium Lead Times Long Lead Times<br />

o<br />

New and fashion<br />

trends are<br />

manufactured in<br />

close proximity of<br />

the retailer (within<br />

the UK), as the<br />

products will only<br />

take 2-3 weeks to<br />

get to the retailer.<br />

Only small<br />

quantities are<br />

manufactured as<br />

different products<br />

will come in trend.<br />

o<br />

o<br />

Classic products are<br />

manufactured in<br />

Europe in countries<br />

like; Turkey,<br />

Portugal as well as<br />

some countries in<br />

North Africa like<br />

Tunisia and<br />

Morocco. It takes<br />

take up to 3 months<br />

lead times with<br />

trucks taking 2<br />

weeks from the<br />

factory to the<br />

warehouses in the<br />

UK.<br />

It is more expensive<br />

to make than the<br />

Far East due to the<br />

increased labour<br />

costs.<br />

o<br />

Core products are<br />

manufactured in<br />

Far East in<br />

countries like in;<br />

China, Bangladesh<br />

and Cambodia. It<br />

takes up to a<br />

minimum of 5-6<br />

months lead times<br />

with 6 weeks of<br />

shipping or 2<br />

weeks of airfreight<br />

but the services is<br />

expensive.<br />

Garment<br />

Manufacture<br />

Lead Times<br />