13.07.2019 Views

SUMMER 2019

Distributor's Link Magazine Summer 2019 / Vol 42 No3

Distributor's Link Magazine Summer 2019 / Vol 42 No3

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

198<br />

THE DISTRIBUTOR’S LINK<br />

COMPUTER INSIGHTS INC. HOW MUCH POWER DOES YOUR SYSTEM GIVE YOU? from page 168<br />

The system must be able to commit the components,<br />

so that users know that the components are not available.<br />

Then it must be able to add the value of the process to<br />

the finished product, remove the component(s) from<br />

inventory and add the new part to inventory at the<br />

new cost. Without a system that handles secondary<br />

processes, this process becomes chaotic. Parts show up<br />

in inventory, they disappear without a trace, and then the<br />

other product magically appears in inventory.<br />

No one has any idea of what is going on. Here is an<br />

example of a product that is coming in on a Processing PO:<br />

Here is the lot control and traceability information:<br />

Here is an example of the product that is committed<br />

to that Processing PO:<br />

Receiving the PPO increases the inventory of the<br />

finished part:<br />

Lot Control & Traceability<br />

For many fastener products, lot control is required.<br />

This is not an option; it is a mandatory requirement.<br />

The lot control must include traceabilty to each of<br />

the components that make up the finished product.<br />

If the fastener company is selling Grade 5 or Grade<br />

8 fasteners, this is part of their daily life. If they are<br />

attempting to manage this manually, they are on a fool’s<br />

errand. Some general-purpose systems have what I call<br />

“decorative” lot control. i.e. the system seems like it has<br />

lot control, but it is not robust, nor is it deep enough to<br />

trace back to the components.<br />

These are only a few of the issues; there are many<br />

more, long part numbers, long descriptions, etc. I could<br />

go on and on. Every time you run into a process that<br />

is causing a “work around”, you are wasting time and<br />

money. And you are putting your relationships with your<br />

customers at risk. If your system isn’t helping, it is<br />

hurting you.<br />

At the same time, it reduces the inventory of the<br />

component part:<br />

More Information<br />

To learn about The Business Edge TM<br />

and what it<br />

can for you, contact Computer Insights, Inc. by phone<br />

at: 800-539-1233, email: sales@ci-inc.com or online at<br />

www.ci-inc.com.<br />

COMPUTER INSIGHTS, INC.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!