12.05.2021 Views

WIR 02/2021 [EN]

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CWA cabins and<br />

vehicles in motion<br />

worldwide<br />

Ropeway cabins and vehicles from CWA are used around the globe and are valued<br />

by ropeway operators and passengers alike for their excellent workmanship and high<br />

comfort. Over the years, the Doppelmayr Group’s cabin manufacturer has evolved<br />

into an industrial enterprise that impresses its customers with well-conceived solutions<br />

and new features.<br />

T<br />

he company employs around 170 people<br />

at its base in the Swiss city of Olten.<br />

With this team, CWA develops, designs<br />

and manufactures the cabins and vehicles<br />

that, with few exceptions, are sold to locations<br />

around the world through the Doppelmayr<br />

Group’s sales organization. The product portfolio<br />

offers carriers for all ropeway applications:<br />

from cabins for continuous-movement ropeways<br />

and reversible aerial tramways to vehicles<br />

for funicular railways and custom solutions<br />

such as theme parks. CWA’s services also include<br />

the overhaul of cabins and vehicles as<br />

well as worldwide customer support.<br />

Modern products for modern times<br />

In the last three years, CWA has launched new<br />

cabins for monocable and tricable ropeways<br />

onto the market. The OMEGA V was presented<br />

in 2018 as the fifth generation of the company’s<br />

bestseller, followed by the launch of the<br />

ATRIA for 3S systems in 2019. In terms of functionality<br />

and design, both cabins were consistently<br />

aligned with Doppelmayr’s cutting-edge<br />

ropeway technology and offer passengers an<br />

entirely new ambience inside combined with<br />

even wider perspectives. Thanks to their modular<br />

construction, options can be selected to<br />

address the needs of the ropeway operator and<br />

also retrofitted at a later date. The OMEGA V<br />

now also comes in an AURO version for autonomous<br />

ropeway stations. The first AURO<br />

installation with this CWA cabin went into service<br />

in Zermatt on the Kumme gondola lift in<br />

December 2<strong>02</strong>0 and was presented in detail in<br />

<strong>WIR</strong> Issue 1/2<strong>02</strong>1.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!