INDUSTRIAS GUIDI

To build the Zarate plant IG decided to have

a future looking design in its architecture. The

EV+PP Architectural Study (Egozcue Vidal +

Pastorino Pozzolo) was in charge of the design

and project of the new building. The main

criteria was to optimize the construction`s

functionality by creating a logic of modules

at different levels affecting the ground and

height. The idea was to generate dynamism

in the aspect of the whole place providing an

innovative image with high quality architectural

standards. In this way IG left behind the typical

image of warehouses or factories often seen

in industrial buildings. Another main asset

for the new plant was the light fixture factor.

Designing different levels allowed the entrance

of daylight in a much optimized way all of which

was previously calculated with special lighting

computerized programmes. The objective was

to quantify the use of daylight within the light

fixture and its impact in the production areas.