Eric Lee Selected Portfolio
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
d - s n f
d - us n of
s.
s.
N
ERIC LEE
SELECTION OF PROFESSIONAL WORKS
LEED AP BD+C, WELL AP, ASSOC. AIA
151 EAST 81ST AP# 5A, NEW YORK
NY, 10028, USA +1 646 853 6672
Email: Eric_07091@hotmail.com
Grand Central Terminal (GCT) / MTA - Addition - Feasibility Studies - Retail & Transportation - 5 Stories / New York, New York
Conceptual feasibility studies for Grand Central Terminal - Concourse and Subway Expansion, including introduction of redesigned circulation
for a better pedestrian experience and addition of more transparent retails with new atrium and replacement of existing grand central food market.
Introduction of new atirum space from a proposed supertall tower introduces an opportunity for natural light to existing terminal with transparent -
podium facade for more recognized exposure of the city’s most crucial & busiest subway terminal from the 42nd street. Reponsibilities include
Revit 3D design model production, design option studies & development of presenation materials including design development & visualizations.
Passage
689 - 691 Fifth Avenue Storefront - High-End Retail / Alteration & Renovation - Landmark / New York, New York
Project Architect in charge of high-end retail storefront redevelopment & addition. The project is located in pretigious Fifth avenue & 54th street
and involves redesign of the storefront, signage & entrance for better transparency and modulation for retail . tenant. Responsible for preparing
approved design presentation package by client and landmark preservation commission (LPC) & Construction Document drawing sets for bidding.
4